We have an Exchange 2000 server with TDP for Exchange 5.1.5.  Currently, it
is scheduled to run a full backup every night.  The job reports that it
failed, but if I look at the activity log I see that the job actually
completed successfully.  Has anyone else seen this?


Chris

Reply via email to