I figured it out. I had an error in my script. Thanks Chris
-----Original Message----- From: ADSM: Dist Stor Manager [mailto:[EMAIL PROTECTED] On Behalf Of Bill Boyer Sent: Thursday, October 16, 2003 10:16 PM To: [EMAIL PROTECTED] Subject: Re: TDP for Exchange Schedule reports failure Check the script you are using to run the TDP agent. Whatever the value of ERRORLEVEL is at the time the script completes is the return code for the event. The sample script files have the TDP executable as the last line of the script. So the return code fro the TDP agent is the return code of the script/event. Bill Boyer DSS, Inc. -----Original Message----- From: ADSM: Dist Stor Manager [mailto:[EMAIL PROTECTED] Behalf Of Chris Warren Sent: Thursday, October 16, 2003 5:40 PM To: [EMAIL PROTECTED] Subject: TDP for Exchange Schedule reports failure We have an Exchange 2000 server with TDP for Exchange 5.1.5. Currently, it is scheduled to run a full backup every night. The job reports that it failed, but if I look at the activity log I see that the job actually completed successfully. Has anyone else seen this? Chris