I figured it out. I had an error in my script.
Thanks

Chris

-----Original Message-----
From: ADSM: Dist Stor Manager [mailto:[EMAIL PROTECTED] On Behalf Of
Bill Boyer
Sent: Thursday, October 16, 2003 10:16 PM
To: [EMAIL PROTECTED]
Subject: Re: TDP for Exchange Schedule reports failure

Check the script you are using to run the TDP agent. Whatever the value of
ERRORLEVEL is at the time the script completes is the return code for the
event. The sample script files have the TDP executable as the last line of
the script. So the return code fro the TDP agent is the return code of the
script/event.

Bill Boyer
DSS, Inc.


-----Original Message-----
From: ADSM: Dist Stor Manager [mailto:[EMAIL PROTECTED] Behalf Of
Chris Warren
Sent: Thursday, October 16, 2003 5:40 PM
To: [EMAIL PROTECTED]
Subject: TDP for Exchange Schedule reports failure


We have an Exchange 2000 server with TDP for Exchange 5.1.5.  Currently, it
is scheduled to run a full backup every night.  The job reports that it
failed, but if I look at the activity log I see that the job actually
completed successfully.  Has anyone else seen this?


Chris

Reply via email to