Pretty cool to get a sneak peek into the mccown world even if it's an 
accidental peak 💁‍♂️

On Sun, Jul 12, 2020, 12:53 PM Bill Prince <part15...@gmail.com> wrote:

  Were we the intended audience here?


bp
<part15sbs{at}gmail{dot}com>

On 7/12/2020 12:49 PM, ch...@wbmfg.com wrote:

    Excellent job on the intersection guys.  Y’all just keep getting better at 
what you do.  

    This week Centracom said they are coming to splice and perhaps install 
equipment in the C.O.
    BTW, C.O. stands for Central Office.  Many years ago it was CDO for Central 
Distribution Office.  This is where the telephone operators used to manually 
switch telephone calls with “cord boards”.  Later automatic switching equipment 
took over that job but the C.O. has remained.  Internet companies frequently 
call their main tech office the NOC Network Operations Center.  NOC is probably 
taking over for C.O. but I am an older dude and will continue to refer to the 
C.O.  Ours is so small it would more properly be called a Carrier Hut or 
Remote.  But I digress.

    We want everything looking as nice as we can for our upstream provider’s 
visit.  

    Inside the C.O. we need the following done:
    Racks straightened
    Batteries reversed
    Walls and ceiling washed
    Stairs installed
    Unused wires and equipment removed
    Wires straightened up and dressed better
    Perhaps run the 120 VAC to the inverter input

    Outside the C.O. we need the following:
    Back wall painted where the ducts are.  
    Box that was over that area removed from the field to the North and either 
saved for repurpose or put in the scrap metal dumpster.
    All weeds removed from the fenced area.
    Gravel covering 100% of that area.

    Outside the fenced area we need the following:
    Put all the pieces of that motorhome in the dump trailer.  Any other 
garbage too and take it to the dump.
    Move that motorhome chassis somewhere it is not obvious.
    Clean up, straight up etc the lot.  Make sure all the trucks and such are 
parked in a nice orderly fashion.
    Knock down any weeds and lay down weed killer in those spots.  

    Need to make sure not to leave the HVAC on in there until we get equipment 
actually needing to be powered.
    Even then, we will want to set it no lower than 90 degrees.  Just got 15 
days worth of power bill (someone had left the AC on down to about 65 degrees) 
and the bill was $100.  With no revenue producing customers yet, I don’t want 
recurring expenses.  

     
  -- 
  AF mailing list
  AF@af.afmug.com
  http://af.afmug.com/mailman/listinfo/af_af.afmug.com



--------------------------------------------------------------------------------
-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com
-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to