I always had a rock adder, and a minimum of $2500 for repeated attempts. Mobilization expense as well.
From: Josh Luthman Sent: Thursday, December 22, 2022 9:25 AM To: AnimalFarm Microwave Users Group Subject: Re: [AFMUG] HDD per foot cost $7 for non rock (in town, out of town, short shot, long shot) $100 for rock. Had a handful of this with creek beds On Thu, Dec 22, 2022 at 10:57 AM Carl Peterson <cpeter...@portnetworks.com> wrote: I'm paying $15 and supplying all duct, trace, and mule tape. Seems high but it is a rush project and other utilities are tight in some areas. Getting the project done on time is important so I wasn't as concerned with the cost. Just wondering what I should be looking for for ongoing work. On Thu, Dec 22, 2022 at 9:31 AM Aeron Wireless <b...@aeronwireless.com> wrote: I think this past summer we paid $11/ft in Michigan. We negotiated that price winter of '2. I'm sure it's higher now. HDD drill plus 2x 1.24" SDR11 with tracer pull back. We supplied all materials. sent from my android phone On Thu, Dec 22, 2022, 10:25 AM Carl Peterson <cpeter...@portnetworks.com> wrote: What is the going rate per foot for HDD drilling and pullback of two SDR11 ducts and a trace wire? Very sandy soil in the FL panhandle. All materials provided? Around 4-5K' split into three or four runs. -- Carl Peterson PORT NETWORKS 401 E Pratt St, Ste 2553 Baltimore, MD 21202 (410) 637-3707 -- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com -- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com -- Carl Peterson PORT NETWORKS 401 E Pratt St, Ste 2553 Baltimore, MD 21202 (410) 637-3707 -- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com -------------------------------------------------------------------------------- -- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com
-- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com