Can't help with the LP Monitor, but here's my Control Sequence for a 2 wire generator start with Weekly testing.

Relay 5 disconnects all load from the panel, Relay 6 controls primary/backup feed to the panel. I found that if I didn't disconnect the load before switching, I would pop breakers.





On 5/18/2015 10:16 PM, David Milholen wrote:
I am looking for a LP gas gauge that has a sensor for remote
sense in the measure of ohms to connect to a site monitor or possibly the standby controller we have
to let us know the level of our LP tank.

ALSO forest,
If you would be so kind to tell me the secret rule for configuring the exorcise rule for a 2 wire generator config. When I set it up it either doesnt start at all or even trigger the standby sequence. Other configs I have tried
will start it but it doesnt complete the cycle.


--