David,
 If you want clarification of any of these points please do not hesiate
to contact me. This is the method employed at all mines where stope
design is carried out from a block model. Stope design against a block
model is done for most mines during the feasibility stage where cashflow
figures must be reported, then during production at smaller mines stope
design is normally just done against geological interpretation with
evaluation
against a block model once a year to produce the grade tonnage reports,
while at larger mines where mine planning is ongoing stoping is continuously
being designed against the block model.

Regards Digby Millikan
Geolite Mining Systems
[EMAIL PROTECTED]
http://www.users.on.net/digbym


--
* To post a message to the list, send it to [EMAIL PROTECTED]
* As a general service to the users, please remember to post a summary of any useful 
responses to your questions.
* To unsubscribe, send an email to [EMAIL PROTECTED] with no subject and "unsubscribe 
ai-geostats" followed by "end" on the next line in the message body. DO NOT SEND 
Subscribe/Unsubscribe requests to the list
* Support to the list is provided at http://www.ai-geostats.org

Reply via email to