Esko Dijk <[email protected]> wrote: > I've reviewed the open PRs at: https://github.com/anima-wg/voucher/pulls > For most of these, I would say go ahead and merge.
okay, I said I'd wait until April 1-ish.
> Once merged, people interested can do a thorough review of the entire set
of changes.
The posted I-D includes all of those changes, so the DT diff already includes
that.
>> I noticed btw, that there was no SID allocation for manufacturer-private
in
>> the document. I will fix that in the next few days. I made something
up for
>> the slides :-)
> In PR #81 the YANG leaf is introduced, but no SID number it seems.
Yes.
--
Michael Richardson <[email protected]>, Sandelman Software Works
-= IPv6 IoT consulting =- *I*LIKE*TRAINS*
signature.asc
Description: PGP signature
_______________________________________________ Anima mailing list -- [email protected] To unsubscribe send an email to [email protected]
