Hi,

how do u enter Expected receipt for a month in which the plan is running and
following 2 month =500

in the system, coz if u want this to be captured, you will have to tell the
system about it.

Let me know that and then I can guide you further

On Fri, Feb 20, 2009 at 5:59 PM, ghoshsubhajit <ghoshsubha...@yahoo.co.in>wrote:

>   Dear All
>
> I am facing problem in following area :
>
> The client has multiple warehouse across among which there are 3 main
> warehouse.These warehouses refill the other warehouses through transfer
> order.
> All the warehouse maintains individual item sales forecast on a monthly
> basis.
>
> The monthly purchase planning is done using the following formula
>
> *Order to be placed for Current Month= Opening stock for the month
> +Expected receipt of this month and following two month in the warehouse –
> Foretasted Sales of this month and following two month. *
>
> I am trying to generate a planned purchase order for a specific item on a
> particular site and warehouse on certain given parameter as below.
>
> I have set up Coverage group (which is attached to the item) with the
> following parameter:-
>
> *Coverage code= "Requirement"
> Coverage Time Fence and Period =90 Days
> Forecast Plan Time Fence = 90 Days
> Future and Action Time Fence =90 Days
> Negetive and Positive Days =0 Days*
>
> In the individual item coverage apart from all the above parameter the min
> and max level given as 0 and the Purchase Lead time is 60 Days for the main
> warehouse and the transfer lead time is 15 days for the child warehouse.
> On the basis of the above parameter when I am running the master schedule
> and forecast schedule the system is generating requirement on the above
> parameter which is proper.
>
> But how can I create a planned purchase order on the basis of the formula
> given above.
>
> Example:-
> For a particular item in a site and warehouse
>
> Opening Stock=1000
> Expected receipt for a month in which the plan is running and following 2
> month =500
> Foretasted Sales for a month in which the plan is running and following two
> month=2000
>
> Planned order to be created for Current Month= (1000+500)- 2000= 500
>
>
> Please suggest me how to do it.
>
> Regards
>
> Subhajit Ghosh
>
>
> 
>



-- 