What does the troubleshooting NTP (I forget the exact name & number, but if
you have a PP, you probably know it) say about error 7011 1213 and 0999
0012? I notice the former is a critical while the latter is a major; also,
the times on the errors sometime overlap. You may have to read down into the
verbiage to get a description. It's highly likely they both result from a
single root cause, and looking at the detailed description on both error
messages may yield what the PP thinks is the problem. That should then lead
you to what needs to change (and that might be on either switch).

Sorry I can't help more than that, but I don't have PP handy anymore.

Annlee

Raul Arango wrote:
> 
> Hi,
> 
> I am having a stability trouble with an IMA configured over a
> Cisco 3600 router. The IMA is connected to a Nortel Passport
> 7480.
> The IMA has 2 links, and continuously one of the links fails. 
> 
> Here is the IMA configuration:
> 
> interface ATM1/0
>  no ip address
>  no ip mroute-cache
>  no atm oversubscribe
>  no atm ilmi-keepalive
>  ima-group 0
>  scrambling-payload
>  impedance 120-ohm
> !
> interface ATM1/1
>  no ip address
>  no ip mroute-cache
>  no atm oversubscribe
>  no atm ilmi-keepalive
>  ima-group 0
>  scrambling-payload
>  impedance 120-ohm
> !
> 
> interface ATM1/IMA0
>  no ip address
>  no atm ilmi-keepalive
> !
> interface ATM1/IMA0.1 point-to-point
>  ip address 10.7.128.154 255.255.255.252
>  pvc 3/223
>   ubr 3840
>   encapsulation aal5snap
>  !
> !
> interface ATM1/IMA0.2 point-to-point
>  ip address 10.16.0.82 255.255.255.252
>  pvc 3/224
> 
> As can be seen, the passport detects many remote links failures:
> 
> CRITICAL SET 70111213 03-06-29 17:35:45 EM/PPMAL010 LP/1 IMA/1
> LK/2
> CRITICAL SET 70111213 03-06-29 17:35:45 EM/PPMAL010 LP/1 IMA/1
> LK/1
> CLEARED  CLR 70111213 03-06-29 17:35:55 EM/PPMAL010 LP/1 IMA/1
> LK/2
> CLEARED  CLR 70111213 03-06-29 17:35:55 EM/PPMAL010 LP/1 IMA/1
> LK/1
> MAJOR    SET 09990012 03-06-29 18:07:40 EM/PPMAL010 LP/1 IMA/1
> LK/2
> CLEARED  CLR 09990012 03-06-29 18:10:19 EM/PPMAL010 LP/1 IMA/1
> LK/2
> MAJOR    SET 09990012 03-06-29 18:10:48 EM/PPMAL010 LP/1 IMA/1
> LK/1
> CRITICAL SET 70111213 03-06-29 18:17:42 EM/PPMAL010 LP/1 IMA/1
> LK/1
> CLEARED  CLR 09990012 03-06-29 18:17:42 EM/PPMAL010 LP/1 IMA/1
> LK/1
> CLEARED  CLR 70111213 03-06-29 18:17:52 EM/PPMAL010 LP/1 IMA/1
> LK/1
> 
> I want to know if somebody have experience configuring IMA in
> similar surroundings and can help me.
> 
> Regards,
> 
> Raśl.
> 


Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=71654&t=71632
--------------------------------------------------
FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]

Reply via email to