I have a question on Spanning tree across the core layer. If I have switch
stacks that look like the following diagram:

2924    2924    2924    2924    2924    2924    2924    2924    2924
2924    2924    2924    2924    2924    2924    2924    2924    2924
2924    2924    2924    2924    2924    2924    2924    2924    2924
2924    2924    2924    2924    2924    2924    2924    2924    2924

5000    5000    5000    5000    5000    5000    5000    5000    5000

                            6500a                    6500b

If I have two links going to each 6500 from the 5000s and the 6500a switch
is the root bridge, then is 6500b switch even going to be used. From my
understanding of STP, all traffic is going to go through the root bridge in
the even of redundant paths. If this is true then (not that I am downing
fault tolerance) it is a waste of a switch that costs thousands of dollars
just to sit there and wait for the 6500a switch to go down. Am I getting
this correct or is there a way to setup STP so both 6500s get used with
about the same load?



___________________________________
UPDATED Posting Guidelines: http://www.groupstudy.com/list/guide.html
FAQ, list archives, and subscription info: http://www.groupstudy.com
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]

Reply via email to