Which supervisor module do you have installed in your Catalyst? If it's not
a Sup III, you'll get this message on port two and three of a three port gig
module. The earlier supervisor modules can't support the bandwidth required
by this blade.
-----Original Message-----
From: Cheng Chee Woon [mailto:[EMAIL PROTECTED]]
Sent: Wednesday, January 17, 2001 7:02 AM
To: [EMAIL PROTECTED]
Subject: Inactive Port on Catalyst 5509
Hi, can anyone tell me how to activate a port on catalyst 5509 ? If I do a
"show port" on the CLI, this is the result that I get :
4/1 notconnect 2 normal full 1000 No GBIC
4/2 inactive 3 normal full 1000 No GBIC
4/3 inactive 1 normal full 1000 No GBIC
5/1 notconnect 1 normal auto auto
10/100BaseTX
5/2 notconnect 1 normal auto auto
10/100BaseTX
Thanks,
Cheng Chee Woon
Network Consultant
JOS Systems Sdn Bhd
Fax : 03-7880 5223
DID : 03-7883 6803
email : [EMAIL PROTECTED]
_________________________________
FAQ, list archives, and subscription info:
http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]
_________________________________
FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]