They removed the bubblers from the docks (yesterday) here on the Eastern Shore 
of Maryland. Time to get to work. Already put new bilge pump in the lowest part 
of the keel sump - on to a few annual maintenance issues, set the mast, and 
then go sailing!

Gary
  ----- Original Message ----- 
  From: Hoyt, Mike 
  To: cnc-list@cnc-list.com 
  Sent: Friday, March 21, 2014 11:09 AM
  Subject: Re: Stus-List Spring Projects


  The water is still a bit too solid here for launching

   

  From: CnC-List [mailto:cnc-list-boun...@cnc-list.com] On Behalf Of Joel 
Aronson
  Sent: Friday, March 21, 2014 11:57 AM
  To: cnc-list@cnc-list.com
  Subject: Re: Stus-List Spring Projects

   

  Completed (not by me)

  Cutlass bearing

  Re do Max Prop

  repack stuffing box

  Paint bottom (next week)

   

  (by me)

  new clutches - port side

  2 new thru hulls/seacocks in bow

  New hoses for head/relocate vented loops for more storage under vee berth

  Remove/replace plotter

  Boot stripes -  Red/Sapphire Blue

  Built emergency rudder and MOB pole

   

  Still to do:

  install new triducer

  replace outhaul and reefing lines

  finish gybe preventer

  connect plotter to VHF

  locate/repair leak (probably from winch)

  install MOB pole holder a/k/a a piece of PVC

   

  Launch in one week!!

   

  Joel

   

  On Fri, Mar 21, 2014 at 10:23 AM, Stevan Plavsa <stevanpla...@gmail.com> 
wrote:

  On Suhana:

   

  - Paint boot stripes (brightside or perfection, haven't decided yet but 
keeping original C&C red/blue/darker blue)

  - bottom paint

  - repack stuffing box

  - dismantle pedestal and inspect steering components, replace/repair as 
necessary

  - Ambitious but, repaint pedestal. 

  - exhaust hose replacement

  - tune up the A4 (all ignition components and install new racor)

  - replace mast collar

  - rigging inspection 

  - new halyards

  - washdown pump

  - install tank level monitor (thanks Fred)

   

  We'll see how much of that I get done.

   

  Steve

  Suhana, C&C 32

  Toronto

   

  On Fri, Mar 21, 2014 at 10:13 AM, Edd Schillay <e...@schillay.com> wrote:

    Listers,

     

    Now that Spring has finally sprung, I was curious to see what other listers 
have planned for their Spring projects on their C&Cs. 

     

    So far, planned for the Enterprise:

     

      a.. Relocate engine gauges and move engine-starting switches. 
      b.. change transmission/throttle controls at helm
      c.. New coat of Petit Vivid
      d.. Add another coat or two of boot stripes
      e.. New interior cushions
      f.. Add cockpit lighting
      g.. (Maybe) Bolt centerboard inside keel and cover up the "slot"
      h.. Install bimini
      i.. Redo the remaining floorboards
      j.. Store spinnaker pole
      k.. Install Tactick wind vane and repeater
      l.. Service the refrigerator.
      m.. Install two solar vents
     

     

     

    All the best,

     

    Edd

     

     

    Edd M. Schillay

    Starship Enterprise

    C&C 37+ | Sail No: NCC-1701-B

    City Island, NY 

    Starship Enterprise's Captain's Log

     

     

    _______________________________________________
    This List is provided by the C&C Photo Album
    http://www.cncphotoalbum.com
    CnC-List@cnc-list.com

   


  _______________________________________________
  This List is provided by the C&C Photo Album
  http://www.cncphotoalbum.com
  CnC-List@cnc-list.com





   

  -- 
  Joel 
  301 541 8551 



------------------------------------------------------------------------------


  _______________________________________________
  This List is provided by the C&C Photo Album
  http://www.cncphotoalbum.com
  CnC-List@cnc-list.com
_______________________________________________
This List is provided by the C&C Photo Album
http://www.cncphotoalbum.com
CnC-List@cnc-list.com

Reply via email to