SEZ9 commented on PR #11512: URL: https://github.com/apache/seatunnel/pull/11512#issuecomment-5882783635
Follow-up on F1–F8 at the current head (`9ebef25cbcd3`), relative to `5165e0878b95`. Per the thread, the two commits since `5165e0878b95` are dev-sync/merge commits that did not touch any of the F1–F8 files, so this range does not by itself change the status of those findings. To close them out, could you point to the specific commits or diff hunks that address each one? In particular: - **F4** – where the doc now describes the registration-based enumerator report path. - **F5** – where the doc lists the connectors that currently implement the progress provider. For **F1, F2, F3, F6, F7 and F8**, a quick pointer to the relevant hunk would also help so each can be verified against the diff rather than assumed unchanged. If further commits touch any of these areas, please call that out in the PR description so the corresponding finding can be re-checked. <!-- streview-comment:1400 --> -- This is an automated message from the Apache Git Service. To respond to the message, please log on to GitHub and use the URL above to go to the specific comment. To unsubscribe, e-mail: [email protected] For queries about this service, please contact Infrastructure at: [email protected]
