+1

* Checked all sigs and hashes
* Looked at diffs for each from last release.

On Mon, Sep 11, 2017 at 5:44 PM, Christopher <ctubb...@apache.org> wrote:
> Fluo Developers,
>
> I've taken the liberty of preparing some release candidates to update our
> build tooling. I've prepared both build-resources-2.0.0 and fluo-parent-2.
>
> Please consider the following candidate for Fluo Build Resources 2.0.0.
>
> Git Commit:
>     9784af748d2f3d12b243ef266b7e27805026ed81
> Branch:
>     build-resources-2.0.0-rc1
>
> If this vote passes, a gpg-signed tag will be created using:
>     git tag -f -m 'Apache Fluo Build Resources 2.0.0' -s
> rel/build-resources-2.0.0 \
>     9784af748d2f3d12b243ef266b7e27805026ed81
>
> ALSO, please consider the following candidate for Fluo Parent POM 2.
>
> Git Commit:
>     0491222187ac3f4bc76181ba2fb2e24aba04eff8
> Branch:
>     fluo-parent-2-rc1
>
> If this vote passes, a gpg-signed tag will be created using:
>     git tag -f -m 'Apache Fluo Parent POM 2' -s rel/fluo-parent-2 \
>     0491222187ac3f4bc76181ba2fb2e24aba04eff8
>
>
> Staging repo:
> https://repository.apache.org/content/repositories/orgapachefluo-1019
> Source (official release artifact):
> https://repository.apache.org/content/repositories/orgapachefluo-1019/org/apache/fluo/build-resources/2.0.0/build-resources-2.0.0-source-release.tar.gz
> Source (official release artifact):
> https://repository.apache.org/content/repositories/orgapachefluo-1019/org/apache/fluo/fluo-parent/2/fluo-parent-2-source-release.tar.gz
> (Append ".sha1", ".md5", or ".asc" to download the signature/hash for a
> given artifact.)
>
> All artifacts were built and staged with:
>     mvn release:prepare && mvn release:perform
>
> Signing keys are available at https://www.apache.org/dist/fluo/KEYS
> (Expected fingerprint: 8CC4F8A2B29C2B040F2B835D6F0CDAE700B6899D)
>
> Please vote one of:
> [ ] +1 - I have verified and accept...
> [ ] +0 - I have reservations, but not strong enough to vote against...
> [ ] -1 - Because..., I do not accept...
> ... these artifacts as the 2.0.0 release of Apache Fluo Build Resources.
>
> This vote will remain open until at least Thu Sep 14 22:00:00 UTC 2017 (Thu
> Sep 14 18:00:00 EDT 2017 / Thu Sep 14 15:00:00 PDT 2017).
> Voting can continue after this deadline until the release manager sends an
> email ending the vote.
>
> Thanks!
>
> P.S. Hint: download the whole staging repo with
>     wget -erobots=off -r -l inf -np -nH \
>     https://repository.apache.org/content/repositories/orgapachefluo-1019/
>     # note the trailing slash is needed

Reply via email to