[
https://issues.apache.org/jira/browse/OOZIE-1532?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14039194#comment-14039194
]
Purshotam Shah commented on OOZIE-1532:
---------------------------------------
{quote}
The new addition with this patch processCoordActions() should take of old coord
actions of running coordinator (should delete coord actions, related workflows
and workflow actions)
{quote}
My only concern is that long running coord jobs will also have FAILED(without
WF)/TIMEOUT actions and we are not purging them. I believe we can do it in much
simple and efficient way as pointed out in my previous comment.
> Purging should remove completed children job for long running coordinator jobs
> ------------------------------------------------------------------------------
>
> Key: OOZIE-1532
> URL: https://issues.apache.org/jira/browse/OOZIE-1532
> Project: Oozie
> Issue Type: New Feature
> Reporter: Srikanth Sundarrajan
> Assignee: Bowen Zhang
> Attachments: oozie-1532.patch, oozie-1532.patch, oozie-1532.patch
>
>
> Specifically, this is for long running coordinator jobs with high frequency.
> all child workflows are never purged as the coord job is still running.
> Oozie server configuration that indicates how many coordinator actions
> frequency ticks to keep. By doing this it would be possible to purge running
> coord jobs. By default this would not be enabled and the current logic would
> remain.
--
This message was sent by Atlassian JIRA
(v6.2#6252)