Hi community,

A. Background:

Recently, two deterministic compilation failures were reproducible on the
`dev` branch after changes had been merged:

1. [PR #11954: Fix the missing test constant reference](
https://github.com/apache/seatunnel/pull/11954)
   A previous change removed a constant but missed one remaining reference,
   causing the test sources in `seatunnel-engine-server` to fail
compilation.
2. [PR #10998: Adapt to a method signature change](
https://github.com/apache/seatunnel/pull/10998)
   A parameter was added to a method signature, but one call site was not
   updated, causing `JdbcHiveIT` to fail compilation.

These were deterministic compilation errors rather than flaky failures. CI
for
an individual PR validates the PR at that point in time, but it cannot fully
guarantee that the PR will still build successfully when combined with the
latest `dev` branch and other PRs merged shortly before it.


B. Merge Queue introduction:

Merge Queue adds a final integration gate before a PR enters `dev`. After
`Merge when ready` is clicked, the PR is not merged immediately. GitHub
creates
a temporary `merge_group` containing the latest `dev`, the current PR, and
the
PRs ahead of it in the queue, and then triggers the configured CI checks.

The PR is merged in order only after all required checks pass. If a check
fails,
times out, or a conflict occurs, the corresponding PR is removed from the
queue
and the `dev` branch remains unchanged. This validates the final
combination of
changes immediately before merging and prevents independently successful PRs
from breaking `dev` when merged consecutively.

Official documentation: [GitHub Merge Queue]
<https://docs.github.com/en/repositories/configuring-branches-and-merges-in-your-repository/configuring-pull-request-merges/managing-a-merge-queue>


C. Questions and answers:

[1] What test scope will the merge queue execute?
    It will run:   ./mvnw -B -T 1C clean install -DskipTests
This command skips test execution but still compiles both main and test
sources,
allowing deterministic errors such as missing constants and incompatible
method
signatures to be detected.


[2] What state will a PR be in if the build fails?
    The PR will be removed from the queue and remain open. The PR page will
show the
Merge Queue failure reason and build logs. After the problem is fixed or the
branch is rebased, someone with Write permission must click `Merge when
ready`
again to re-enter the queue.

[3] How long will a merge queue build take?
   Recent comparable single-threaded full `install` CI jobs averaged about
20 minutes. With a four-core runner and `-T 1C`, one PR is expected to take
approximately 10–20 minutes. A 30-minute timeout is recommended.

[4] If the merge queue build fails, has the PR already been merged?
   No. A PR is merged only after the Merge Queue build succeeds. If the
build
fails, the PR remains open and `dev` is unchanged.

[5] After the Merge Queue is introduced, can I choose to merge directly
without
entering the queue?
   A direct-merge option can be retained, but only for administrators or
users with
Branch Protection Bypass permission when the branch protection rule allows
bypassing. Regular users with Write permission must still use Merge Queue.

[6] If one of several queued PRs fails, will the entire queue fail, and how
will it be handled?
   No. The failed PR is removed from the queue. Any later temporary branches
containing that PR become invalid, so GitHub recreates them from the updated
queue and runs their checks again.

[7] Can merge queue builds run in parallel?
    Yes. `Build concurrency` can be configured from 1 to 100. An initial
value of 5
is recommended, allowing up to five queued PRs to be validated concurrently
while additional PRs wait.

[8] How many PRs can be added to the queue at one time, and what happens
after
that number is exceeded?
   Each operation adds the current PR, while the queue can continue
accepting
additional PRs. GitHub does not publish a total queue-length limit. PRs
exceeding
the configured build concurrency wait in FIFO order; they are not fail

Feedback and suggestions are welcome.

Best regards,
Zhiwei Niu

Reply via email to