Good direction. Looking forward to your PR.


Best Regards,
David
Linkedin: https://www.linkedin.com/in/davidzollo



On Tue, Aug 25, 2026 at 3:20 AM zhiwei niu <[email protected]> wrote:

> Hi guys,
>
> I found some related discussions from ASF and Apache Kafka.
>
> ASF discussed the temporary branches created by GitHub Merge Queue in
> LEGAL-599, which has now been resolved:
>
> https://issues.apache.org/jira/browse/LEGAL-599
>
> Kafka has accepted KIP-1126 to introduce GitHub Merge Queue:
>
>
> https://cwiki.apache.org/confluence/spaces/KAFKA/pages/340036064/KIP-1126+Serialize+changes+to+Kafka+with+a+build+queue
>
> Kafka also created an ASF-hosted sandbox for evaluation:
>
> https://github.com/apache/kafka-merge-queue-sandbox
>
> The implementation is still being tracked here:
>
> https://issues.apache.org/jira/browse/KAFKA-18789
>
> This shows that there is already precedent for Apache projects to explore
> and adopt Merge Queue.
>
>
> Best regards,
> Zhiwei Niu
>
>
> Doyeon Kim <[email protected]> 于2026年8月25日周二 14:01写道:
>
> > +1
> >
> > On Tue, Aug 25, 2026 at 2:05 PM zhiwei niu <[email protected]> wrote:
> >
> > > Hi community,
> > >
> > > A. Background:
> > >
> > > Recently, two deterministic compilation failures were reproducible on
> the
> > > `dev` branch after changes had been merged:
> > >
> > > 1. [PR #11954: Fix the missing test constant reference](
> > > https://github.com/apache/seatunnel/pull/11954)
> > >    A previous change removed a constant but missed one remaining
> > reference,
> > >    causing the test sources in `seatunnel-engine-server` to fail
> > > compilation.
> > > 2. [PR #10998: Adapt to a method signature change](
> > > https://github.com/apache/seatunnel/pull/10998)
> > >    A parameter was added to a method signature, but one call site was
> not
> > >    updated, causing `JdbcHiveIT` to fail compilation.
> > >
> > > These were deterministic compilation errors rather than flaky failures.
> > CI
> > > for
> > > an individual PR validates the PR at that point in time, but it cannot
> > > fully
> > > guarantee that the PR will still build successfully when combined with
> > the
> > > latest `dev` branch and other PRs merged shortly before it.
> > >
> > >
> > > B. Merge Queue introduction:
> > >
> > > Merge Queue adds a final integration gate before a PR enters `dev`.
> After
> > > `Merge when ready` is clicked, the PR is not merged immediately. GitHub
> > > creates
> > > a temporary `merge_group` containing the latest `dev`, the current PR,
> > and
> > > the
> > > PRs ahead of it in the queue, and then triggers the configured CI
> checks.
> > >
> > > The PR is merged in order only after all required checks pass. If a
> check
> > > fails,
> > > times out, or a conflict occurs, the corresponding PR is removed from
> the
> > > queue
> > > and the `dev` branch remains unchanged. This validates the final
> > > combination of
> > > changes immediately before merging and prevents independently
> successful
> > > PRs
> > > from breaking `dev` when merged consecutively.
> > >
> > > Official documentation: [GitHub Merge Queue]
> > > <
> > >
> >
> https://docs.github.com/en/repositories/configuring-branches-and-merges-in-your-repository/configuring-pull-request-merges/managing-a-merge-queue
> > > >
> > >
> > >
> > > C. Questions and answers:
> > >
> > > [1] What test scope will the merge queue execute?
> > >     It will run:   ./mvnw -B -T 1C clean install -DskipTests
> > > This command skips test execution but still compiles both main and test
> > > sources,
> > > allowing deterministic errors such as missing constants and
> incompatible
> > > method
> > > signatures to be detected.
> > >
> > >
> > > [2] What state will a PR be in if the build fails?
> > >     The PR will be removed from the queue and remain open. The PR page
> > will
> > > show the
> > > Merge Queue failure reason and build logs. After the problem is fixed
> or
> > > the
> > > branch is rebased, someone with Write permission must click `Merge when
> > > ready`
> > > again to re-enter the queue.
> > >
> > > [3] How long will a merge queue build take?
> > >    Recent comparable single-threaded full `install` CI jobs averaged
> > about
> > > 20 minutes. With a four-core runner and `-T 1C`, one PR is expected to
> > take
> > > approximately 10–20 minutes. A 30-minute timeout is recommended.
> > >
> > > [4] If the merge queue build fails, has the PR already been merged?
> > >    No. A PR is merged only after the Merge Queue build succeeds. If the
> > > build
> > > fails, the PR remains open and `dev` is unchanged.
> > >
> > > [5] After the Merge Queue is introduced, can I choose to merge directly
> > > without
> > > entering the queue?
> > >    A direct-merge option can be retained, but only for administrators
> or
> > > users with
> > > Branch Protection Bypass permission when the branch protection rule
> > allows
> > > bypassing. Regular users with Write permission must still use Merge
> > Queue.
> > >
> > > [6] If one of several queued PRs fails, will the entire queue fail, and
> > how
> > > will it be handled?
> > >    No. The failed PR is removed from the queue. Any later temporary
> > > branches
> > > containing that PR become invalid, so GitHub recreates them from the
> > > updated
> > > queue and runs their checks again.
> > >
> > > [7] Can merge queue builds run in parallel?
> > >     Yes. `Build concurrency` can be configured from 1 to 100. An
> initial
> > > value of 5
> > > is recommended, allowing up to five queued PRs to be validated
> > concurrently
> > > while additional PRs wait.
> > >
> > > [8] How many PRs can be added to the queue at one time, and what
> happens
> > > after
> > > that number is exceeded?
> > >    Each operation adds the current PR, while the queue can continue
> > > accepting
> > > additional PRs. GitHub does not publish a total queue-length limit. PRs
> > > exceeding
> > > the configured build concurrency wait in FIFO order; they are not fail
> > >
> > > Feedback and suggestions are welcome.
> > >
> > > Best regards,
> > > Zhiwei Niu
> > >
> >
>

Reply via email to