Merged


Best Regards,
David
Linkedin: https://www.linkedin.com/in/davidzollo



On Wed, Aug 26, 2026 at 4:53 AM zhiwei niu <[email protected]> wrote:

> Hi community,
>
> Following the review feedback, I opened a follow-up PR:
> https://github.com/apache/seatunnel/pull/11970
>
> It:
>
>    1. Remove the retry wrapper from the two Maven compilation steps. A
>    retry cannot reliably distinguish a temporary dependency-download
> failure
>    from a deterministic compilation failure introduced by the queued
> change,
>    so the original failure should be reported directly.
>    2. Configure the ASF Infra apache/root team as the emergency fallback
>    for the Merge Queue ruleset. This uses the same team ID as existing ASF
>    configurations and is intended only as a last-resort recovery path when
> the
>    queue remains unavailable after normal troubleshooting.
>    3. Adds English and Chinese guides for queue usage, troubleshooting, and
>    recovery.
>
> Feedback is welcome.
>
>
> Best regards,
> Zhiwei Niu
>
>
> David Zollo <[email protected]> 于2026年8月26日周三 11:54写道:
>
> > Good job. I've merged this PR just now and I look forward to seeing the
> > latest effect.
> >
> >
> >
> > Best Regards,
> > David
> > Linkedin: https://www.linkedin.com/in/davidzollo
> >
> >
> >
> > On Tue, Aug 25, 2026 at 12:44 PM zhiwei niu <[email protected]> wrote:
> >
> > > Hi community,
> > >
> > > Thanks for the feedback. I have opened the implementation PR:
> > >
> > > https://github.com/apache/seatunnel/pull/11963
> > >
> > > Looking forward to the review and suggestions in PR
> > >
> > >
> > > Best regards,
> > > Zhiwei Niu
> > >
> > >
> > > David Zollo <[email protected]> 于2026年8月25日周二 23:15写道:
> > >
> > > > Good direction. Looking forward to your PR.
> > > >
> > > >
> > > >
> > > > Best Regards,
> > > > David
> > > > Linkedin: https://www.linkedin.com/in/davidzollo
> > > >
> > > >
> > > >
> > > > On Tue, Aug 25, 2026 at 3:20 AM zhiwei niu <[email protected]>
> > wrote:
> > > >
> > > > > Hi guys,
> > > > >
> > > > > I found some related discussions from ASF and Apache Kafka.
> > > > >
> > > > > ASF discussed the temporary branches created by GitHub Merge Queue
> in
> > > > > LEGAL-599, which has now been resolved:
> > > > >
> > > > > https://issues.apache.org/jira/browse/LEGAL-599
> > > > >
> > > > > Kafka has accepted KIP-1126 to introduce GitHub Merge Queue:
> > > > >
> > > > >
> > > > >
> > > >
> > >
> >
> https://cwiki.apache.org/confluence/spaces/KAFKA/pages/340036064/KIP-1126+Serialize+changes+to+Kafka+with+a+build+queue
> > > > >
> > > > > Kafka also created an ASF-hosted sandbox for evaluation:
> > > > >
> > > > > https://github.com/apache/kafka-merge-queue-sandbox
> > > > >
> > > > > The implementation is still being tracked here:
> > > > >
> > > > > https://issues.apache.org/jira/browse/KAFKA-18789
> > > > >
> > > > > This shows that there is already precedent for Apache projects to
> > > explore
> > > > > and adopt Merge Queue.
> > > > >
> > > > >
> > > > > Best regards,
> > > > > Zhiwei Niu
> > > > >
> > > > >
> > > > > Doyeon Kim <[email protected]> 于2026年8月25日周二 14:01写道:
> > > > >
> > > > > > +1
> > > > > >
> > > > > > On Tue, Aug 25, 2026 at 2:05 PM zhiwei niu <[email protected]>
> > > > wrote:
> > > > > >
> > > > > > > Hi community,
> > > > > > >
> > > > > > > A. Background:
> > > > > > >
> > > > > > > Recently, two deterministic compilation failures were
> > reproducible
> > > on
> > > > > the
> > > > > > > `dev` branch after changes had been merged:
> > > > > > >
> > > > > > > 1. [PR #11954: Fix the missing test constant reference](
> > > > > > > https://github.com/apache/seatunnel/pull/11954)
> > > > > > >    A previous change removed a constant but missed one
> remaining
> > > > > > reference,
> > > > > > >    causing the test sources in `seatunnel-engine-server` to
> fail
> > > > > > > compilation.
> > > > > > > 2. [PR #10998: Adapt to a method signature change](
> > > > > > > https://github.com/apache/seatunnel/pull/10998)
> > > > > > >    A parameter was added to a method signature, but one call
> site
> > > was
> > > > > not
> > > > > > >    updated, causing `JdbcHiveIT` to fail compilation.
> > > > > > >
> > > > > > > These were deterministic compilation errors rather than flaky
> > > > failures.
> > > > > > CI
> > > > > > > for
> > > > > > > an individual PR validates the PR at that point in time, but it
> > > > cannot
> > > > > > > fully
> > > > > > > guarantee that the PR will still build successfully when
> combined
> > > > with
> > > > > > the
> > > > > > > latest `dev` branch and other PRs merged shortly before it.
> > > > > > >
> > > > > > >
> > > > > > > B. Merge Queue introduction:
> > > > > > >
> > > > > > > Merge Queue adds a final integration gate before a PR enters
> > `dev`.
> > > > > After
> > > > > > > `Merge when ready` is clicked, the PR is not merged
> immediately.
> > > > GitHub
> > > > > > > creates
> > > > > > > a temporary `merge_group` containing the latest `dev`, the
> > current
> > > > PR,
> > > > > > and
> > > > > > > the
> > > > > > > PRs ahead of it in the queue, and then triggers the configured
> CI
> > > > > checks.
> > > > > > >
> > > > > > > The PR is merged in order only after all required checks pass.
> > If a
> > > > > check
> > > > > > > fails,
> > > > > > > times out, or a conflict occurs, the corresponding PR is
> removed
> > > from
> > > > > the
> > > > > > > queue
> > > > > > > and the `dev` branch remains unchanged. This validates the
> final
> > > > > > > combination of
> > > > > > > changes immediately before merging and prevents independently
> > > > > successful
> > > > > > > PRs
> > > > > > > from breaking `dev` when merged consecutively.
> > > > > > >
> > > > > > > Official documentation: [GitHub Merge Queue]
> > > > > > > <
> > > > > > >
> > > > > >
> > > > >
> > > >
> > >
> >
> https://docs.github.com/en/repositories/configuring-branches-and-merges-in-your-repository/configuring-pull-request-merges/managing-a-merge-queue
> > > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > C. Questions and answers:
> > > > > > >
> > > > > > > [1] What test scope will the merge queue execute?
> > > > > > >     It will run:   ./mvnw -B -T 1C clean install -DskipTests
> > > > > > > This command skips test execution but still compiles both main
> > and
> > > > test
> > > > > > > sources,
> > > > > > > allowing deterministic errors such as missing constants and
> > > > > incompatible
> > > > > > > method
> > > > > > > signatures to be detected.
> > > > > > >
> > > > > > >
> > > > > > > [2] What state will a PR be in if the build fails?
> > > > > > >     The PR will be removed from the queue and remain open. The
> PR
> > > > page
> > > > > > will
> > > > > > > show the
> > > > > > > Merge Queue failure reason and build logs. After the problem is
> > > fixed
> > > > > or
> > > > > > > the
> > > > > > > branch is rebased, someone with Write permission must click
> > `Merge
> > > > when
> > > > > > > ready`
> > > > > > > again to re-enter the queue.
> > > > > > >
> > > > > > > [3] How long will a merge queue build take?
> > > > > > >    Recent comparable single-threaded full `install` CI jobs
> > > averaged
> > > > > > about
> > > > > > > 20 minutes. With a four-core runner and `-T 1C`, one PR is
> > expected
> > > > to
> > > > > > take
> > > > > > > approximately 10–20 minutes. A 30-minute timeout is
> recommended.
> > > > > > >
> > > > > > > [4] If the merge queue build fails, has the PR already been
> > merged?
> > > > > > >    No. A PR is merged only after the Merge Queue build
> succeeds.
> > If
> > > > the
> > > > > > > build
> > > > > > > fails, the PR remains open and `dev` is unchanged.
> > > > > > >
> > > > > > > [5] After the Merge Queue is introduced, can I choose to merge
> > > > directly
> > > > > > > without
> > > > > > > entering the queue?
> > > > > > >    A direct-merge option can be retained, but only for
> > > administrators
> > > > > or
> > > > > > > users with
> > > > > > > Branch Protection Bypass permission when the branch protection
> > rule
> > > > > > allows
> > > > > > > bypassing. Regular users with Write permission must still use
> > Merge
> > > > > > Queue.
> > > > > > >
> > > > > > > [6] If one of several queued PRs fails, will the entire queue
> > fail,
> > > > and
> > > > > > how
> > > > > > > will it be handled?
> > > > > > >    No. The failed PR is removed from the queue. Any later
> > temporary
> > > > > > > branches
> > > > > > > containing that PR become invalid, so GitHub recreates them
> from
> > > the
> > > > > > > updated
> > > > > > > queue and runs their checks again.
> > > > > > >
> > > > > > > [7] Can merge queue builds run in parallel?
> > > > > > >     Yes. `Build concurrency` can be configured from 1 to 100.
> An
> > > > > initial
> > > > > > > value of 5
> > > > > > > is recommended, allowing up to five queued PRs to be validated
> > > > > > concurrently
> > > > > > > while additional PRs wait.
> > > > > > >
> > > > > > > [8] How many PRs can be added to the queue at one time, and
> what
> > > > > happens
> > > > > > > after
> > > > > > > that number is exceeded?
> > > > > > >    Each operation adds the current PR, while the queue can
> > continue
> > > > > > > accepting
> > > > > > > additional PRs. GitHub does not publish a total queue-length
> > limit.
> > > > PRs
> > > > > > > exceeding
> > > > > > > the configured build concurrency wait in FIFO order; they are
> not
> > > > fail
> > > > > > >
> > > > > > > Feedback and suggestions are welcome.
> > > > > > >
> > > > > > > Best regards,
> > > > > > > Zhiwei Niu
> > > > > > >
> > > > > >
> > > > >
> > > >
> > >
> >
>

Reply via email to