I have a question about record retention. We make ITE which incorporates lasers and certify to LVD, EMC directives. We do not create a TCF specifically. We do have outside lab test reports for safety and for EMC. We also have the usual parts lists and CAD drawings for fabrication and assembly along with test procedures. We do record all production tests required for each product shipped.
What documents do we need to keep and how long do we need to keep them? We keep the form where we record production tests required for compliance (hipot, ground continuity, laser safety, etc.) for ten years. What engineering drawings, parts lists, test procedures, etc. do we need to keep and for how long? Can anyone point me to a specific reference that requires this? Thank you in advance for your comments. Scott s_doug...@ecrm.com --------- This message is coming from the emc-pstc discussion list. To cancel your subscription, send mail to majord...@ieee.org with the single line: "unsubscribe emc-pstc" (without the quotes). For help, send mail to ed.pr...@cubic.com, jim_bac...@monarch.com, ri...@sdd.hp.com, or roger.volgst...@compaq.com (the list administrators).