I would like your opinion on the application of the following:

IEC 61010-1
6.5.2.3 PROTECTIVE CONDUCTOR TERMINAL
f) Plug-in type PROTECTIVE CONDUCTOR TERMINALS combined with other TERMINALS 
and intended to be connected
and disconnected without the use of a TOOL, shall be designed so that the 
protective conductor connection
makes first and breaks last with respect to the other connections. Examples 
include plugs and appliance
couplers for MAINS cords and connector assemblies of plug-in units.


Does the term, "intended to be connected and disconnected . . ." mean during 
normal operation or normal condition? Does this section apply to connectors 
that are connected during the initial installation and is not ever intended to 
be disconnected unless the equipment is being disassembled or serviced?

We have an application where Unit A supplies AC Mains and PE conductor to Unit 
B along with other conductors in one multi-contact connector. But Unit B would 
never be disconnected from Unit A while Unit A was power up.  The connector we 
want to use has a locking ring but it does not require a tool to disconnect. 
Having the PE terminals mate first and break last would be a challenge.

If this rule does apply, can I get around the "makes first and breaks last" 
requirement in the connector by putting a warning label near the connector to 
"Disconnect Power Before Removing Connector", or something like that.

Thanks,
The Other Brian
________________________________

LECO Corporation Notice: This communication may contain confidential 
information intended for the named recipient(s) only. If you received this by 
mistake, please destroy it and notify us of the error. Thank you.

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>

Reply via email to