I think it's pretty common to have 13.8kV available to a business location. Usually a step-down transformer is provided at site but in this case, they may want to use 13.8kV directly.

The other factor which could make a huge difference is load leveling using a large battery. That would help as long as there's a modest amount of time between charges.

Peri

------ Original Message ------
From: "EVDL Administrator via EV" <ev@lists.evdl.org>
To: "Electric Vehicle Discussion List" <ev@lists.evdl.org>
Cc: "EVDL Administrator" <evp...@drmm.net>
Sent: 06-Sep-18 5:21:39 PM
Subject: Re: [EVDL] EVLN: 400kW (1080mph) EVSE new2 GM> (not new-tech 2others)

On 6 Sep 2018 at 20:00, Alan Arrison via EV wrote:

Each charger would require its own electrical substation.

Really? I'm far from an expert on electric utility issues, but 400kW is about the total peak capacity of 4 recently built bloated McMansions (main
panel == 400 amps at 240 volts).  I don't see a substation for every 4
houses in those neighborhoods, but maybe I'm missing something. And of course those houses aren't all running at peak load all the time, either.

David Roden - Akron, Ohio, USA
EVDL Administrator

= = = = = = = = = = = = = = = = = = = = = = = = = = = = =
EVDL Information: http://www.evdl.org/help/
= = = = = = = = = = = = = = = = = = = = = = = = = = = = =
Note: mail sent to "evpost" and "etpost" addresses will not
reach me.  To send a private message, please obtain my
email address from the webpage http://www.evdl.org/help/ .
= = = = = = = = = = = = = = = = = = = = = = = = = = = = =


_______________________________________________
UNSUBSCRIBE: http://www.evdl.org/help/index.html#usub
http://lists.evdl.org/listinfo.cgi/ev-evdl.org
Please discuss EV drag racing at NEDRA (http://groups.yahoo.com/group/NEDRA)


_______________________________________________
UNSUBSCRIBE: http://www.evdl.org/help/index.html#usub
http://lists.evdl.org/listinfo.cgi/ev-evdl.org
Please discuss EV drag racing at NEDRA (http://groups.yahoo.com/group/NEDRA)

Reply via email to