------------------------------------<snip>------------------------------------
Good point. I have no idea whether there is actually a frequent need to
make a functional change in the IPLTEXT or if 99.9% of the changes are
just to match dates with Nucleus. If the later, then the Nucleus and
IPLTEXT should obviously contain something that indicates an IPLTEXT
version required by the Nucleus that could be verified instead of the
date, and a differently dated nucleus that still requires the same
IPLTEXT functional level could still indicate the old IPLTEXT version.
That way the IPL process could validate IPLNEXT/nucleus compatibility
without requiring a date match, and the need to update IPLTEXT would be
minimized.
----------------------------------<unsnip>------------------------------------
IIRC, the NUCLEUS is the ONLY part of the system that uses SCTR loading.
I have to wonder if changes in the SCTR loading is related to IPLTEXT
changes?
Rick
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html