Hi all, We have a parallel Sysplex with 2 members.one of them is a CPU Z900 (2064 -1C5) with Z/OS 1.8 as operating system and the other is CPU Z900(2064-216) with the same operating system. We have a weird problem with CPU 2064-216 as follows: When we power on reset the CPU and IPL from that,It works OK. for about 12 hours and after that it degrades and the jobs take much more times to complete.(about 4 times).The major things is decreasing No. of SIO for the jobs.after that even REIPL is not resolve the problem and we have to POWER ON RESET the CPU and REIPL for the next 12 hours!!. We exchange the operating systems between two CPUs but the problem is exactly the same.
Does anybody have the same experience ? Any help should by highly appreciated. Regards, Manshadi ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN