Here is a picture of the top and bottom cowl for fit check on the firewall. 
The old air duct for left cylinder bank cooling is peaking through the left 
air intake opening.  Will make an adapter for the front end and reuse the 
fiberglass engine cooling ducts.

https://s3.amazonaws.com/expercraft/sidwood/50792709452f2dd354a5ef.jpg

Still have to cut an oil service door for preflight access and bond captive 
stop nuts.

Sid Wood
Tri-gear KR-2 N6242
Mechanicsville, MD, USA




Reply via email to