Greetings, I've noticed that there are some LSMB users now migrating to 1.3 (from 1.2). Is 1.3 for testing only?
I noticed that 1.3 is now on "milestone 3". At what milestone (7? 8? 9?) will 1.3 be considered production level? I have a client with a 1.2.18 install but with only about 2-dozen entries. I could easily have those reentered into 1.3 if 1.3 is considered stable enough. Thanks. Michael ------------------------------------------------------------------------------ _______________________________________________ Ledger-smb-users mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/ledger-smb-users
