I'm sure you have an answer for everything, but people in my area were
being connected.

On 6 Jan 2018 6:39 AM, "Greg Low" <[email protected]> wrote:

> "When the fttp values were being installed, and they said that they'd
> passed 1000 homes but only connected 16, that is simply because homes had
> over a year to switch over"
>
>
>
> It wasn't actually. The issue was that even if they wanted to, only 16
> could connect. They had passed places like unit blocks where no lead in
> work had occurred.
>
>
>
> Regards,
>
>
>
> Greg
>
>
>
> Dr Greg Low
>
>
>
> 1300SQLSQL (1300 775 775) office | +61 419201410 mobile│ +61 3 8676 4913
> fax
>
> SQL Down Under | Web: www.sqldownunder.com |http://greglow.me
>
>
>
> *From:* [email protected] [mailto:ozdotnet-bounces@
> ozdotnet.com] *On Behalf Of *Tony Wright
> *Sent:* Saturday, 6 January 2018 10:32 AM
> *To:* ozDotNet <[email protected]>
> *Subject:* Re: [OT] Internet use on 4G LTE
>
>
>
> May as well have taken that $11 billion and made a big pile of money and
> burnt it all. What a financially incompetent move.
>
>
>
> When you replace your modem you don't choose the same modem or even one
> that is only a touch better than what you have, you get rid of your draft n
> modem and replace it with an ac modem. The only thing they ended up
> promising was the same speed that you could already get from adsl2. What a
> disgrace.
>
>
>
> Now, back to Greg's comment. I actually agree that it should have been a
> nation building project. Done one, done right.
>
>
>
> In Thailand there could be 100 fttp providers, but the consequence of that
> is that there are thousands of fibre cables hanging off power lines in a
> huge mess. Such is pure capitalism, where anyone is allowed to provide that
> service.
>
>
>
> In Vietnam, they have 3 providers, but they still have 100s of fibre
> cables neatly bundled again hanging oft power lines.
>
>
>
> When the fttp values were being installed, and they said that they'd
> passed 1000 homes but only connected 16, that is simply because homes had
> over a year to switch over.
>
>
>
> The nbn at the time was running 6 months behind.
>
>
>
> In my area, I was scheduled to receive nbn about a month after nbn 1 was
> cancelled. I believe that would have happened 6 months later, as I had seen
> the cabling being installed in Carlton  just down the road.
>
>
>
> That was almost 3 years ago. Now, instead, they want to install hfc. Hfc
> so far has failed. They have delayed the install because everyone that has
> switched over had substandard failing nbn. Thanks to Liberal incompetence.
>
>
>
> It's an absolute disaster of Turnbulls making and it makes me mad. I would
> have had pure nbn about 2 years ago, and now look at the state of things.
>
>
>
> My only respite is that I have existing 10 year old Telstra cable that
> provides me with 114Mbps download and 2Mbps upload.
>
>
>
> This should be seen for what it is - an absolute failure of the Liberal
> Party policy.
>
>
>
>
>
>
>
> On 5 Jan 2018 9:30 PM, "David Connors" <[email protected]> wrote:
>
>
>
> On Fri., 5 Jan. 2018, 8:51 pm Ken Schaefer, <[email protected]> wrote:
>
> Are you being deliberately obtuse? In 2011 (per you link), NBN was going
> to be fibre-to-the-premise. There was no technical need to buy any HFC or
> copper, and as you say, compensation was for destroying an existing
> business model.
>
> That's right however when the second definitive agreement was negotiated
> the $11bln price stated the same, hence the price of the HFC and CAN were
> $0.
>
>
>
> David
>
> --
>
> David Connors
> [email protected] | @davidconnors | https://t.me/davidconnors
> | LinkedIn | +61 417 189 363
>
>
>

Reply via email to