On Sun, 2009-01-25 at 12:06 -0500, Tom Lane wrote: > If we want to ensure that 8.5 development opens soon, what we have to > do is reject those two patches, revert updatable views, and finish up > the other stuff (which is all small and could likely be dealt with in > a week or two). That puts us in position to go beta by perhaps > mid-February with release perhaps on May 1. If we don't, I hereby > predict that 8.4 release will not happen before September.
Expecting a release around September with those patches a bit optimistic, IMHO. We already experienced that a release just after summer is not possible. So, unless there is a way to commit SELinux+Hot Standby+Sync Replication in the next two weeks (or so), as you wrote, we should reject those patches and release 8.4 on time. (Oh, personally I'd like to see all these features at 8.4, from advocacy side). -- Devrim GÜNDÜZ, RHCE devrim~gunduz.org, devrim~PostgreSQL.org, devrim.gunduz~linux.org.tr http://www.gunduz.org
signature.asc
Description: This is a digitally signed message part