On 5/30/24 08:41, Aditya Gupta wrote:
Hello Cedric,

On Tue, May 28, 2024 at 09:15:29AM GMT, Cédric Le Goater wrote:
On 5/28/24 09:05, Aditya Gupta wrote:
Skiboot/OPAL patches are in discussion upstream [1], with corresponding
commits in github repository [2].

Update skiboot.lid, with binary built from 'upstream_power11' branch
of skiboot repository with Power11 enablement patches [2].

---
This patch can be skipped for now, if need to wait for patches to be
merged in open-power/skiboot. Have updated the skiboot.lid to aid in
testing this patch series.

When is the merge in skiboot planned ? QEMU 9.1 freeze is in ~2 months.

I have asked, will let you know when I get the expected time.

The typical flow would to be merge a new skiboot.lid with Power11 first,
than this series.


Thanks,

C.



[1]:https://lists.ozlabs.org/pipermail/skiboot/2024-April/018963.html
[2]:https://github.com/maheshsal/skiboot.

Cc: Cédric Le Goater<c...@kaod.org>
Cc: Joel Stanley<j...@jms.id.au>
Cc: Mahesh J Salgaonkar<mah...@linux.ibm.com>
Cc: Madhavan Srinivasan<ma...@linux.ibm.com>
Cc: Nicholas Piggin<npig...@gmail.com>
Signed-off-by: Aditya Gupta<adit...@linux.ibm.com>
---
   pc-bios/skiboot.lid | Bin 2527328 -> 2527328 bytes

Please don't resend. This is big !

Oh okay. Sure.

Thanks,
Aditya Gupta


Thanks,

C.






Reply via email to