I have seen 25 year old oaty flashings rot out in the sun too. I think caulked L-feet is a more long lasting solution to roof mounts.

Todd


Blair May wrote:
Whats wrong with doing it right the first time? Flashing is the only way to insure that you don't have to use that liability insurance & that the install is water tight. I would speak to the inspector & try to work out proper flashings installed in the future & see if he will waive the removal & replacment of the exisiting installs.
Welcome to my world where we loose jobs regularly to other installers that do not use proper flashing methods.
Yeah it does increase the cost, but the install should have a life cycle of 25 years.
-----Original Message-----
From: re-wrenches-boun...@lists.re-wrenches.org [mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of Nick Soleil
Sent: Wednesday, June 23, 2010 8:10 PM
To: RE-wrenches
Subject: Re: [RE-wrenches] Flashed Footing Requirements

Who can help:
    One of our local jurisdictions, City of Petaluma, is beginning to require flashed footings under all solar arrays.  I think that some flashed footings are better than the Unirac L feet or Prosolar's TileTrac foot, but the flashed footings cost a lot more $, and some flashed footing products seem flawed (less watertight)  They are asking me to uninstall two commissioned systems from last week, and replace the footings with flashed Fast Jacks, even though the documents detailed the penetration method. 
    I am looking for some good info that supports flexible installation methods, including caulked footings.  Our industry has come a long way from the early days of racking on slotted angle iron with steel L-brackets for feet, but those experiences tend to give me confidence in continuing to use caulked footings.  
Nick Soleil
Project Manager
Advanced Alternative Energy Solutions, LLC
PO Box 657
Petaluma, CA 94953
Cell: 707-321-2937
Office: 707-789-9537
Fax: 707-769-9037



 yy 

_______________________________________________ List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

  

--
Todd Cory

Todd Cory

KE6SXS

toddc...@finestplanet.com

Mt. Shasta Energy Services

License C-10  #811428

P.O. Box 689

Mt. Shasta, CA. 96067

(530) 926-1079

 

“I'd put my money on solar energy...I hope we don't have to wait till oil and coal run out before we tackle that." 

∞ Thomas Edison, in conversation with Henry Ford and Harvey Firestone, March 1931

 

_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to