As a caution: The TL22 inverters have been discontinued. The TL40s have some limitations as compared to the TL22s, in my opinion. You may still find TL22s on the shelf. William [image: Gradient Cap_mini] Lic 773985 millersolar.com <http://www.millersolar.com/> 805-438-5600 *From:* RE-wrenches [mailto:re-wrenches-boun...@lists.re-wrenches.org] *On Behalf Of *Tump *Sent:* Wednesday, March 08, 2017 1:13 PM *To:* findso...@herzfeld.org; RE-wrenches *Subject:* Re: [RE-wrenches] Aquion Batteries I have dual Sunny Islands & dual SB 4000TL22US w/ 20 stack on one and another site w/ the *Aspen 48M* w/ Schneider. I will say this; cost per amp hour of storage sucks w/ the Aquion batteries. Both my client and I feel, that the batteries, despite there size have very little capacity. The “30”%DOD, that I have the SIs set to start the Gen set, charges the stacks OK but one gets better performance from charging w/slower solar source. The Aspen48M is ~ 42X28X42” @563 AH of capacity, UnigyII 2000 Ah ~ 42x40x6’ tall. Batteries are defiantly temperature sensitive, operating should be ~ 60*. The set up w/ the SMA product, adds additional cost due to the required BM200 AND the Sunny Island Interface Device, and the SM100 unless you are buying theAspen48M which comes pre wired. (*Aspen 48M which comes thru w/ the sensing module installed). It is quite helpful, if this is an off grid install due to the fact that the BM200 needs and when things go south Aquion can toggle the unit off site and help w/ configuration & **upgrades, to be connected to the internet. This install also needs the correct firmware to be installed on the SI which when was delivered, the firmware would only load into the master then shut down the system. Had to reconfigure as 2 separate units, load the firm ware and then reconfigure for 2 phase. * *I have spoken to the manufacture re/ lack of capacity and was told that must be my loads…. NOT. * *I would suggest that despite their hype these are quite expensive and require quite a bit more of labor IF you are wiring the un sensed stacks. And there is definitely a learning curve if you are using the SI.* *My own system and what I prefer to push IS the SMA SI w/ the SMA SBs (make sure that you get the TL22s as the newest SB is not compatible for “ AC coupling” in this configuration) w/ the Unigy II/MK line. (same battery) These have buss bars, stack vertically , the interlocking stacks is perfect for earthquake locations. AND are totally **recyclable.* *Pictures of the SMA install & insights of battery installation available, contact me off line. TUMP * On Mar 8, 2017, at 12:55 PM, Martin Herzfeld <findso...@herzfeld.org> wrote: Has anyone worked with them with a Sunny Island? Space is not an issue for this client. Martin Herzfeld, IREC Certified Master Trainer ™ for PV Installation Professional #IREC 10037 California Solar Contractor License #00833782 C46, D56, D31, C-7 Solar, Trenching, Pole Installation & Maintenance, Instrumentation UL Certified PV Installer #17, OSHA 30 OSHA-Authorized Construction Trainer #C0068034 CompTIA Certified Technical Classroom Trainer (CTT+) #T3NSZCNBBKB4QTQG Registered NABCEP Continuing Education (CE) Provider On Jul 20, 2016 2:00 PM, "Jerry Shafer" <jerrysgarag...@gmail.com> wrote: We had a customer request them but once we found out how many it would take, he decided on the deka unigee instead. l dont like running my OB's at such a low voltage as they seem to get hotter due to the higher current. Some of our other product lines don't even reccomend aquions due to that low voltage, suggest asking your inverter manufacture too. On Jul 20, 2016 10:52 AM, "Drake" <drake.chamber...@redwoodalliance.org> wrote: Hello Wrenches, I have a client who is going to take the plunge and buy a set of Aquion Batteries. They look pretty good on paper, but I'm not sure how well an inverter would function at the 40 V minimum. Does anyone have experience to recommend them or warn against using them? Thanks, Drake Drake Chamberlin *Athens Electric LLCOH License 44810CO License 3773NABCEP Certified Solar PV 740-448-7328 <740-448-7328>*http://athens-electric.com/ _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org *t...@swnl.net <blocked::mailto:t...@swnl.net%22%20%5Co%20%22blocked::mailto:t...@swnl.net>* *www.SWNL.net* <blocked::http://www.swnl.net/%22%20%5Co%20%22blocked::http://www.swnl.net/> Solarwinds Northernlights * Serving Mid Coast Maine & Northern California* * 207-832-7574 Cl. 610-517-8401 * *Blair "TUMP" May* * ******** MAINE'S CHARTER ******** ** NABCEP "Certified PV Installer"* * ******** MAINE'S CHARTER ******** ** Trace Xantrex "Certified" Dealer / Installer"*
_______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org