As of Friday, Oct. 1st, 2010, the following locomotive assignments are in
effect on SHABBONA RR's 2nd District.
RS-3 #37 will work East in consist on the next #252 to Mooar Yard where it will
replace RS-1 #33, as the Mooar Yard switch engine. #33 will work in consist
back to Terminal District on #251.
Boiler-equipped RS-2 #34, which has been the assigned power on the Midday Mail
trains, #'s 3 & 4, will replace boiler-equipped (for coach yard switching) RS-1
#30 as the Terminal District switch engine. Dual purpose F7A #19 and
boiler-equipped F7B #19A will be the assigned power for #'s 3 & 4.
In serviceable storage are F2A #09A, F7B #15A, and F7A #18L. To be sidelined
for inspection and repairs are RS-1's #30 & 33, and RS-3 #35. All other
locomotive assignments remain unchanged.
Bob Nicholson, CMO & General Manager
SHABBONA RR ______________________________________________
------------------------------------
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/S-Scale/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/S-Scale/join
(Yahoo! ID required)
<*> To change settings via email:
[email protected]
[email protected]
<*> To unsubscribe from this group, send an email to:
[email protected]
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/