Re: [AFMUG] Cable documentation

2017-04-10 Thread Chuck McCown
As far as numbering went, they would do a 2.5N type of thing.  

From: Forrest Christian (List Account) 
Sent: Sunday, April 09, 2017 9:23 PM
To: af 
Subject: Re: [AFMUG] Cable documentation

One has to ask... 

How did they deal with those situations in which a cable cut or other similar 
event necessitated the addition of another ped in the middle?

On Sun, Apr 9, 2017 at 9:18 AM, Chuck McCown <ch...@wbmfg.com> wrote:

  Everybody has their own numbering system.  One company I worked for had 
things like 3E4SW2N  so that would be starting from the C.O.  3peds East, 4 
southwest, 2 north.  One just ran sequential numbers.  Different engineering 
companies have their own numbering standards if the customer does not specify.  

  From: Brian Webster 
  Sent: Saturday, April 08, 2017 7:30 PM
  To: af@afmug.com 
  Subject: Re: [AFMUG] Cable documentation

  When I was helping on the Google fiber designs (working for Ericsson), the 
distances were measured by what they called stationing distances. This was 
usually a distance from a given starting point be in a CO or fiber hut or other 
logical origination. It was measured in feet and had its own notation/number 
system. Engineering drawing for the build always show the stationing distance 
for things like poles, vaults and such. It was linear distance and not 
cable/fiber distance. This gives you a fixed point anywhere along the plant 
even when the fiber lengths may change due to cuts and such. Chuck can probably 
explain the numbering system better. I would then add fields for fiber length 
and OTDR test measurements in the database records. Ericsson has an outside 
plant database and GIS system and that was how they set things up. It was very 
elaborate to the point of managing fibers/circuits, butterfly diagrams for 
manhole/vault layouts with all the ports and fiber bundles, cross connect and 
splice points, etc. The backed database was large and had many relationships.





  Found some documentation I had when learning about stationing.



  Stationing is the fundamental system of measurement used for road layout and 
construction. Stations are reference points that are placed along the 
horizontal measurement of a route centerline or a baseline at some regular 
interval. Generally, the distance between two adjoining stations along a route 
is 100 feet. The first station located at the beginning of the baseline is 
0+00, and the next station located 100 feet from it is 1+00. Therefore, a 
station number of 10+34.05 denotes 1,034.05 feet (10*100 + 34.05) from the 
starting station.









  Thank You,

  Brian Webster

  www.wirelessmapping.com

  www.Broadband-Mapping.com



  From: Af [mailto:af-boun...@afmug.com] On Behalf Of Chuck McCown
  Sent: Saturday, April 08, 2017 10:21 AM
  To: af@afmug.com
  Subject: Re: [AFMUG] Cable documentation



  No, that whole route is there.  All the details are on that sheet.  It is a 4 
strand cable that is spliced at cherry and apple handhole



  From: Adam Moffett 

  Sent: Saturday, April 08, 2017 5:52 AM

  To: af@afmug.com 

  Subject: Re: [AFMUG] Cable documentation



  It seems like the book starts with the endpoints at the COwhich makes 
sense because that's where you'll start troubleshooting from.



  Would there be a separate book for whatever cable is carrying strand 3 from 
Cherry and Apple to VPres ?





  -- Original Message --

  From: "Chuck McCown" <ch...@wbmfg.com>

  To: af@afmug.com

  Sent: 4/7/2017 11:16:39 PM

  Subject: Re: [AFMUG] Cable documentation



See if you can open this:

https://drive.google.com/open?id=0B-W9J8tPanuAeU1Lc3BDYWlVSjg



Very rudimentary.  But you can see that some of the strands on the cable go 
clear to the end.

Other strands are cut at a hand hole and spliced to another cable.



The other cable is shown at the far right.  The >< symbols show it is 
spliced to a different cable.  You connect the > to the < as you jump  over 
handholes that are not part of the circuit for that strand.



The – is a splice.  The 0 or dot is the end termination.  I used to have 
lots of color coding etc.  I could not find any of the old copper cable books 
for an example so I hacked this example out.  



From: Adam Moffett 

Sent: Friday, April 07, 2017 8:42 PM

To: af@afmug.com 

Subject: Re: [AFMUG] Cable documentation



One column per splice.then you just type in the footage(s).

Gee that makes sense.  It's as if you've done this before.





-- Original Message --

From: "Chuck McCown" <ch...@wbmfg.com>

To: af@afmug.com

Sent: 4/7/2017 10:31:17 PM

Subject: Re: [AFMUG] Cable documentation



  A spreadsheet works pretty well.  

  One line per strand.  Have fields at the left for details about the 
circuit, customer, type of optics etc.

  Then columns can represent footage to the splice with one column per 
splice. 

Re: [AFMUG] Cable documentation

2017-04-10 Thread Chuck McCown
A new column.  In the old paper records you either split a column or you 
recreated the page.  

From: Forrest Christian (List Account) 
Sent: Sunday, April 09, 2017 9:23 PM
To: af 
Subject: Re: [AFMUG] Cable documentation

One has to ask... 

How did they deal with those situations in which a cable cut or other similar 
event necessitated the addition of another ped in the middle?

On Sun, Apr 9, 2017 at 9:18 AM, Chuck McCown <ch...@wbmfg.com> wrote:

  Everybody has their own numbering system.  One company I worked for had 
things like 3E4SW2N  so that would be starting from the C.O.  3peds East, 4 
southwest, 2 north.  One just ran sequential numbers.  Different engineering 
companies have their own numbering standards if the customer does not specify.  

  From: Brian Webster 
  Sent: Saturday, April 08, 2017 7:30 PM
  To: af@afmug.com 
  Subject: Re: [AFMUG] Cable documentation

  When I was helping on the Google fiber designs (working for Ericsson), the 
distances were measured by what they called stationing distances. This was 
usually a distance from a given starting point be in a CO or fiber hut or other 
logical origination. It was measured in feet and had its own notation/number 
system. Engineering drawing for the build always show the stationing distance 
for things like poles, vaults and such. It was linear distance and not 
cable/fiber distance. This gives you a fixed point anywhere along the plant 
even when the fiber lengths may change due to cuts and such. Chuck can probably 
explain the numbering system better. I would then add fields for fiber length 
and OTDR test measurements in the database records. Ericsson has an outside 
plant database and GIS system and that was how they set things up. It was very 
elaborate to the point of managing fibers/circuits, butterfly diagrams for 
manhole/vault layouts with all the ports and fiber bundles, cross connect and 
splice points, etc. The backed database was large and had many relationships.





  Found some documentation I had when learning about stationing.



  Stationing is the fundamental system of measurement used for road layout and 
construction. Stations are reference points that are placed along the 
horizontal measurement of a route centerline or a baseline at some regular 
interval. Generally, the distance between two adjoining stations along a route 
is 100 feet. The first station located at the beginning of the baseline is 
0+00, and the next station located 100 feet from it is 1+00. Therefore, a 
station number of 10+34.05 denotes 1,034.05 feet (10*100 + 34.05) from the 
starting station.









  Thank You,

  Brian Webster

  www.wirelessmapping.com

  www.Broadband-Mapping.com



  From: Af [mailto:af-boun...@afmug.com] On Behalf Of Chuck McCown
  Sent: Saturday, April 08, 2017 10:21 AM
  To: af@afmug.com
  Subject: Re: [AFMUG] Cable documentation



  No, that whole route is there.  All the details are on that sheet.  It is a 4 
strand cable that is spliced at cherry and apple handhole



  From: Adam Moffett 

  Sent: Saturday, April 08, 2017 5:52 AM

  To: af@afmug.com 

  Subject: Re: [AFMUG] Cable documentation



  It seems like the book starts with the endpoints at the COwhich makes 
sense because that's where you'll start troubleshooting from.



  Would there be a separate book for whatever cable is carrying strand 3 from 
Cherry and Apple to VPres ?





  -- Original Message --

  From: "Chuck McCown" <ch...@wbmfg.com>

  To: af@afmug.com

  Sent: 4/7/2017 11:16:39 PM

  Subject: Re: [AFMUG] Cable documentation



See if you can open this:

https://drive.google.com/open?id=0B-W9J8tPanuAeU1Lc3BDYWlVSjg



Very rudimentary.  But you can see that some of the strands on the cable go 
clear to the end.

Other strands are cut at a hand hole and spliced to another cable.



The other cable is shown at the far right.  The >< symbols show it is 
spliced to a different cable.  You connect the > to the < as you jump  over 
handholes that are not part of the circuit for that strand.



The – is a splice.  The 0 or dot is the end termination.  I used to have 
lots of color coding etc.  I could not find any of the old copper cable books 
for an example so I hacked this example out.  



From: Adam Moffett 

Sent: Friday, April 07, 2017 8:42 PM

To: af@afmug.com 

Subject: Re: [AFMUG] Cable documentation



One column per splice.then you just type in the footage(s).

Gee that makes sense.  It's as if you've done this before.





-- Original Message --

From: "Chuck McCown" <ch...@wbmfg.com>

To: af@afmug.com

Sent: 4/7/2017 10:31:17 PM

Subject: Re: [AFMUG] Cable documentation



  A spreadsheet works pretty well.  

  One line per strand.  Have fields at the left for details about the 
circuit, customer, type of optics etc.

  Then columns can represent footage to the

Re: [AFMUG] Cable documentation

2017-04-09 Thread Forrest Christian (List Account)
One has to ask...

How did they deal with those situations in which a cable cut or other
similar event necessitated the addition of another ped in the middle?

On Sun, Apr 9, 2017 at 9:18 AM, Chuck McCown <ch...@wbmfg.com> wrote:

> Everybody has their own numbering system.  One company I worked for had
> things like 3E4SW2N  so that would be starting from the C.O.  3peds East, 4
> southwest, 2 north.  One just ran sequential numbers.  Different
> engineering companies have their own numbering standards if the customer
> does not specify.
>
> *From:* Brian Webster
> *Sent:* Saturday, April 08, 2017 7:30 PM
> *To:* af@afmug.com
> *Subject:* Re: [AFMUG] Cable documentation
>
>
> When I was helping on the Google fiber designs (working for Ericsson), the
> distances were measured by what they called stationing distances. This was
> usually a distance from a given starting point be in a CO or fiber hut or
> other logical origination. It was measured in feet and had its own
> notation/number system. Engineering drawing for the build always show the
> stationing distance for things like poles, vaults and such. It was linear
> distance and not cable/fiber distance. This gives you a fixed point
> anywhere along the plant even when the fiber lengths may change due to cuts
> and such. Chuck can probably explain the numbering system better. I would
> then add fields for fiber length and OTDR test measurements in the database
> records. Ericsson has an outside plant database and GIS system and that was
> how they set things up. It was very elaborate to the point of managing
> fibers/circuits, butterfly diagrams for manhole/vault layouts with all the
> ports and fiber bundles, cross connect and splice points, etc. The backed
> database was large and had many relationships.
>
>
>
>
>
> Found some documentation I had when learning about stationing.
>
>
>
> Stationing is the fundamental system of measurement used for road layout
> and construction. Stations are reference points that are placed along the
> horizontal measurement of a route centerline or a baseline at some regular
> interval. Generally, the distance between two adjoining stations along a
> route is 100 feet. The first station located at the beginning of the
> baseline is 0+00, and the next station located 100 feet from it is 1+00.
> Therefore, a station number of 10+34.05 denotes 1,034.05 feet (10*100 +
> 34.05) from the starting station.
>
> [image: Placement of stations along a centerline]
>
>
>
>
>
>
>
> Thank You,
>
> Brian Webster
>
> www.wirelessmapping.com
>
> www.Broadband-Mapping.com
>
>
>
> *From:* Af [mailto:af-boun...@afmug.com] *On Behalf Of *Chuck McCown
> *Sent:* Saturday, April 08, 2017 10:21 AM
> *To:* af@afmug.com
> *Subject:* Re: [AFMUG] Cable documentation
>
>
>
> No, that whole route is there.  All the details are on that sheet.  It is
> a 4 strand cable that is spliced at cherry and apple handhole
>
>
>
> *From:* Adam Moffett
>
> *Sent:* Saturday, April 08, 2017 5:52 AM
>
> *To:* af@afmug.com
>
> *Subject:* Re: [AFMUG] Cable documentation
>
>
>
> It seems like the book starts with the endpoints at the COwhich makes
> sense because that's where you'll start troubleshooting from.
>
>
>
> Would there be a separate book for whatever cable is carrying strand 3
> from Cherry and Apple to VPres ?
>
>
>
>
>
> -- Original Message --
>
> From: "Chuck McCown" <ch...@wbmfg.com>
>
> To: af@afmug.com
>
> Sent: 4/7/2017 11:16:39 PM
>
> Subject: Re: [AFMUG] Cable documentation
>
>
>
> See if you can open this:
>
> https://drive.google.com/open?id=0B-W9J8tPanuAeU1Lc3BDYWlVSjg
>
>
>
> Very rudimentary.  But you can see that some of the strands on the cable
> go clear to the end.
>
> Other strands are cut at a hand hole and spliced to another cable.
>
>
>
> The other cable is shown at the far right.  The >< symbols show it is
> spliced to a different cable.  You connect the > to the < as you jump  over
> handholes that are not part of the circuit for that strand.
>
>
>
> The – is a splice.  The 0 or dot is the end termination.  I used to have
> lots of color coding etc.  I could not find any of the old copper cable
> books for an example so I hacked this example out.
>
>
>
> *From:* Adam Moffett
>
> *Sent:* Friday, April 07, 2017 8:42 PM
>
> *To:* af@afmug.com
>
> *Subject:* Re: [AFMUG] Cable documentation
>
>
>
> One column per splice.then you just type in the footage(s).
>
> Gee that makes sense.  It's as if you've done this before.
>
>
>
>
>
> --

Re: [AFMUG] Cable documentation

2017-04-09 Thread Chuck McCown
Everybody has their own numbering system.  One company I worked for had things 
like 3E4SW2N  so that would be starting from the C.O.  3peds East, 4 southwest, 
2 north.  One just ran sequential numbers.  Different engineering companies 
have their own numbering standards if the customer does not specify.  

From: Brian Webster 
Sent: Saturday, April 08, 2017 7:30 PM
To: af@afmug.com 
Subject: Re: [AFMUG] Cable documentation

When I was helping on the Google fiber designs (working for Ericsson), the 
distances were measured by what they called stationing distances. This was 
usually a distance from a given starting point be in a CO or fiber hut or other 
logical origination. It was measured in feet and had its own notation/number 
system. Engineering drawing for the build always show the stationing distance 
for things like poles, vaults and such. It was linear distance and not 
cable/fiber distance. This gives you a fixed point anywhere along the plant 
even when the fiber lengths may change due to cuts and such. Chuck can probably 
explain the numbering system better. I would then add fields for fiber length 
and OTDR test measurements in the database records. Ericsson has an outside 
plant database and GIS system and that was how they set things up. It was very 
elaborate to the point of managing fibers/circuits, butterfly diagrams for 
manhole/vault layouts with all the ports and fiber bundles, cross connect and 
splice points, etc. The backed database was large and had many relationships.

 

 

Found some documentation I had when learning about stationing.

 

Stationing is the fundamental system of measurement used for road layout and 
construction. Stations are reference points that are placed along the 
horizontal measurement of a route centerline or a baseline at some regular 
interval. Generally, the distance between two adjoining stations along a route 
is 100 feet. The first station located at the beginning of the baseline is 
0+00, and the next station located 100 feet from it is 1+00. Therefore, a 
station number of 10+34.05 denotes 1,034.05 feet (10*100 + 34.05) from the 
starting station.



 

 

 

Thank You,

Brian Webster

www.wirelessmapping.com

www.Broadband-Mapping.com

 

From: Af [mailto:af-boun...@afmug.com] On Behalf Of Chuck McCown
Sent: Saturday, April 08, 2017 10:21 AM
To: af@afmug.com
Subject: Re: [AFMUG] Cable documentation

 

No, that whole route is there.  All the details are on that sheet.  It is a 4 
strand cable that is spliced at cherry and apple handhole

 

From: Adam Moffett 

Sent: Saturday, April 08, 2017 5:52 AM

To: af@afmug.com 

Subject: Re: [AFMUG] Cable documentation

 

It seems like the book starts with the endpoints at the COwhich makes sense 
because that's where you'll start troubleshooting from.

 

Would there be a separate book for whatever cable is carrying strand 3 from 
Cherry and Apple to VPres ?

 

 

-- Original Message --

From: "Chuck McCown" <ch...@wbmfg.com>

To: af@afmug.com

Sent: 4/7/2017 11:16:39 PM

Subject: Re: [AFMUG] Cable documentation

 

  See if you can open this:

  https://drive.google.com/open?id=0B-W9J8tPanuAeU1Lc3BDYWlVSjg

   

  Very rudimentary.  But you can see that some of the strands on the cable go 
clear to the end.

  Other strands are cut at a hand hole and spliced to another cable.

   

  The other cable is shown at the far right.  The >< symbols show it is spliced 
to a different cable.  You connect the > to the < as you jump  over handholes 
that are not part of the circuit for that strand.

   

  The – is a splice.  The 0 or dot is the end termination.  I used to have lots 
of color coding etc.  I could not find any of the old copper cable books for an 
example so I hacked this example out.  

   

  From: Adam Moffett 

  Sent: Friday, April 07, 2017 8:42 PM

  To: af@afmug.com 

  Subject: Re: [AFMUG] Cable documentation

   

  One column per splice.then you just type in the footage(s).

  Gee that makes sense.  It's as if you've done this before.

   

   

  -- Original Message --

  From: "Chuck McCown" <ch...@wbmfg.com>

  To: af@afmug.com

  Sent: 4/7/2017 10:31:17 PM

  Subject: Re: [AFMUG] Cable documentation

   

A spreadsheet works pretty well.  

One line per strand.  Have fields at the left for details about the 
circuit, customer, type of optics etc.

Then columns can represent footage to the splice with one column per 
splice.  You can even represent other cables being spliced in and taking off on 
another route.  

 

From: Justin Wilson 

Sent: Friday, April 07, 2017 4:06 PM

    To: af@afmug.com 

Subject: Re: [AFMUG] Cable documentation

 

The line guys would do the following at the local phone company I worked 
out many many years ago.  I am sure there are lots of better ways to do it with 
modern processes. 

 

The cared about a few things.  Where can I find the sp

Re: [AFMUG] Cable documentation

2017-04-08 Thread Brian Webster
When I was helping on the Google fiber designs (working for Ericsson), the 
distances were measured by what they called stationing distances. This was 
usually a distance from a given starting point be in a CO or fiber hut or other 
logical origination. It was measured in feet and had its own notation/number 
system. Engineering drawing for the build always show the stationing distance 
for things like poles, vaults and such. It was linear distance and not 
cable/fiber distance. This gives you a fixed point anywhere along the plant 
even when the fiber lengths may change due to cuts and such. Chuck can probably 
explain the numbering system better. I would then add fields for fiber length 
and OTDR test measurements in the database records. Ericsson has an outside 
plant database and GIS system and that was how they set things up. It was very 
elaborate to the point of managing fibers/circuits, butterfly diagrams for 
manhole/vault layouts with all the ports and fiber bundles, cross connect and 
splice points, etc. The backed database was large and had many relationships.

 

 

Found some documentation I had when learning about stationing.

 

Stationing is the fundamental system of measurement used for road layout and 
construction. Stations are reference points that are placed along the 
horizontal measurement of a route centerline or a baseline at some regular 
interval. Generally, the distance between two adjoining stations along a route 
is 100 feet. The first station located at the beginning of the baseline is 
0+00, and the next station located 100 feet from it is 1+00. Therefore, a 
station number of 10+34.05 denotes 1,034.05 feet (10*100 + 34.05) from the 
starting station.

Placement of stations along a centerline

 

 

 

Thank You,

Brian Webster

www.wirelessmapping.com

www.Broadband-Mapping.com

 

From: Af [mailto:af-boun...@afmug.com] On Behalf Of Chuck McCown
Sent: Saturday, April 08, 2017 10:21 AM
To: af@afmug.com
Subject: Re: [AFMUG] Cable documentation

 

No, that whole route is there.  All the details are on that sheet.  It is a 4 
strand cable that is spliced at cherry and apple handhole

 

From: Adam Moffett 

Sent: Saturday, April 08, 2017 5:52 AM

To: af@afmug.com 

Subject: Re: [AFMUG] Cable documentation

 

It seems like the book starts with the endpoints at the COwhich makes sense 
because that's where you'll start troubleshooting from.

 

Would there be a separate book for whatever cable is carrying strand 3 from 
Cherry and Apple to VPres ?

 

 

-- Original Message --

From: "Chuck McCown" <ch...@wbmfg.com>

To: af@afmug.com

Sent: 4/7/2017 11:16:39 PM

Subject: Re: [AFMUG] Cable documentation

 

See if you can open this:

https://drive.google.com/open?id=0B-W9J8tPanuAeU1Lc3BDYWlVSjg

 

Very rudimentary.  But you can see that some of the strands on the cable go 
clear to the end.

Other strands are cut at a hand hole and spliced to another cable.

 

The other cable is shown at the far right.  The >< symbols show it is spliced 
to a different cable.  You connect the > to the < as you jump  over handholes 
that are not part of the circuit for that strand.

 

The – is a splice.  The 0 or dot is the end termination.  I used to have lots 
of color coding etc.  I could not find any of the old copper cable books for an 
example so I hacked this example out.  

 

From: Adam Moffett 

Sent: Friday, April 07, 2017 8:42 PM

To: af@afmug.com 

Subject: Re: [AFMUG] Cable documentation

 

One column per splice.then you just type in the footage(s).

Gee that makes sense.  It's as if you've done this before.

 

 

-- Original Message --

From: "Chuck McCown" <ch...@wbmfg.com>

To: af@afmug.com

Sent: 4/7/2017 10:31:17 PM

Subject: Re: [AFMUG] Cable documentation

 

A spreadsheet works pretty well.  

One line per strand.  Have fields at the left for details about the circuit, 
customer, type of optics etc.

Then columns can represent footage to the splice with one column per splice.  
You can even represent other cables being spliced in and taking off on another 
route.  

 

From: Justin Wilson 

Sent: Friday, April 07, 2017 4:06 PM

To: af@afmug.com 

Subject: Re: [AFMUG] Cable documentation

 

The line guys would do the following at the local phone company I worked out 
many many years ago.  I am sure there are lots of better ways to do it with 
modern processes. 

 

The cared about a few things.  Where can I find the splice points? Where can I 
find vaults? Where are my slack points on the path and how much is left or do I 
have? How do I do all this in the middle of the night during the rain? During 
install it was specified where the slack loops happen.  They would care about 
the overall material used when running cable.  If they ran down a road to a 
vault all they cared about was how much length off the spool was used. This was 
documented.  

 

Once everything was installed the certificat

Re: [AFMUG] Cable documentation

2017-04-08 Thread Chuck McCown
No, that whole route is there.  All the details are on that sheet.  It is a 4 
strand cable that is spliced at cherry and apple handhole

From: Adam Moffett 
Sent: Saturday, April 08, 2017 5:52 AM
To: af@afmug.com 
Subject: Re: [AFMUG] Cable documentation

It seems like the book starts with the endpoints at the COwhich makes sense 
because that's where you'll start troubleshooting from.

Would there be a separate book for whatever cable is carrying strand 3 from 
Cherry and Apple to VPres ?


-- Original Message --
From: "Chuck McCown" <ch...@wbmfg.com>
To: af@afmug.com
Sent: 4/7/2017 11:16:39 PM
Subject: Re: [AFMUG] Cable documentation

  See if you can open this:
  https://drive.google.com/open?id=0B-W9J8tPanuAeU1Lc3BDYWlVSjg

  Very rudimentary.  But you can see that some of the strands on the cable go 
clear to the end.
  Other strands are cut at a hand hole and spliced to another cable.

  The other cable is shown at the far right.  The >< symbols show it is spliced 
to a different cable.  You connect the > to the < as you jump  over handholes 
that are not part of the circuit for that strand.

  The – is a splice.  The 0 or dot is the end termination.  I used to have lots 
of color coding etc.  I could not find any of the old copper cable books for an 
example so I hacked this example out.  

  From: Adam Moffett 
  Sent: Friday, April 07, 2017 8:42 PM
  To: af@afmug.com 
  Subject: Re: [AFMUG] Cable documentation

  One column per splice.then you just type in the footage(s).
  Gee that makes sense.  It's as if you've done this before.


  -- Original Message --
  From: "Chuck McCown" <ch...@wbmfg.com>
  To: af@afmug.com
  Sent: 4/7/2017 10:31:17 PM
  Subject: Re: [AFMUG] Cable documentation

A spreadsheet works pretty well.  
One line per strand.  Have fields at the left for details about the 
circuit, customer, type of optics etc.
Then columns can represent footage to the splice with one column per 
splice.  You can even represent other cables being spliced in and taking off on 
another route.  

From: Justin Wilson 
Sent: Friday, April 07, 2017 4:06 PM
    To: af@afmug.com 
Subject: Re: [AFMUG] Cable documentation

The line guys would do the following at the local phone company I worked 
out many many years ago.  I am sure there are lots of better ways to do it with 
modern processes. 

The cared about a few things.  Where can I find the splice points? Where 
can I find vaults? Where are my slack points on the path and how much is left 
or do I have? How do I do all this in the middle of the night during the rain? 
During install it was specified where the slack loops happen.  They would care 
about the overall material used when running cable.  If they ran down a road to 
a vault all they cared about was how much length off the spool was used. This 
was documented.  

Once everything was installed the certification notes were included in the 
construction closeout drawings and put in an appendix at the back of the book.  
The linemen did not care about such things. 

I typical do not see fiber being in a twisted pair type of configuration.  
Not sure what everyone else uses, but all the ones I pull apart are side by 
side.  I think there is even a “how it’s made” on fiber optic cable and it has 
a machine that makes sure they do not get twisted.

Just my .02.



Justin Wilson
j...@mtin.net

---
http://www.mtin.net Owner/CEO
xISP Solutions- Consulting – Data Centers - Bandwidth


http://www.midwest-ix.com  COO/Chairman
Internet Exchange - Peering - Distributed Fabric

  On Apr 7, 2017, at 4:23 PM, Adam Moffett <dmmoff...@gmail.com> wrote:

  I started a spreadsheet to document a fiber line.  I figure I'll make a 
new file for each cable, a worksheet for notes on the cable as a whole, a 
worksheet for each buffer tube, and a color coded column for each fiber.  Each 
row will be 100'.  My thought was, if I have a splice enclosure 4200' down the 
line, I'll go down to row 42 and enter "Splice enclosure on pole 305".  Then I 
can note on each fiber whether it passes through the enclosure, or note what it 
splices to, including a reference to another file if necessary. 

  I understand they used to do something similar with 3-ring binders for 
mapping the pairs on phone lines.

  The first question I ran into was which distance do I go by:
  The actual distance the line has traveled
  The cable length, which will be ~15-20% longer due to slack loops
  The fiber length, which will be longer still due to the built in 
twist.but is easily measurable with an OTDR.
  All three somehow?

  Is this even a smart method?  Plan B is to use GIS.  I can add every 
pole, cable, and enclosure as objects in their actual location with properties 
describing the actual distance, cable length, fiber length and anything el

Re: [AFMUG] Cable documentation

2017-04-08 Thread Adam Moffett
It seems like the book starts with the endpoints at the COwhich 
makes sense because that's where you'll start troubleshooting from.


Would there be a separate book for whatever cable is carrying strand 3 
from Cherry and Apple to VPres ?



-- Original Message --
From: "Chuck McCown" <ch...@wbmfg.com>
To: af@afmug.com
Sent: 4/7/2017 11:16:39 PM
Subject: Re: [AFMUG] Cable documentation


See if you can open this:
https://drive.google.com/open?id=0B-W9J8tPanuAeU1Lc3BDYWlVSjg

Very rudimentary.  But you can see that some of the strands on the 
cable go clear to the end.

Other strands are cut at a hand hole and spliced to another cable.

The other cable is shown at the far right.  The >< symbols show it is 
spliced to a different cable.  You connect the > to the < as you jump  
over handholes that are not part of the circuit for that strand.


The – is a splice.  The 0 or dot is the end termination.  I used to 
have lots of color coding etc.  I could not find any of the old copper 
cable books for an example so I hacked this example out.


From:Adam Moffett
Sent: Friday, April 07, 2017 8:42 PM
To:af@afmug.com
Subject: Re: [AFMUG] Cable documentation

One column per splice.then you just type in the footage(s).
Gee that makes sense.  It's as if you've done this before.


-- Original Message --
From: "Chuck McCown" <ch...@wbmfg.com>
To: af@afmug.com
Sent: 4/7/2017 10:31:17 PM
Subject: Re: [AFMUG] Cable documentation


A spreadsheet works pretty well.
One line per strand.  Have fields at the left for details about the 
circuit, customer, type of optics etc.
Then columns can represent footage to the splice with one column per 
splice.  You can even represent other cables being spliced in and 
taking off on another route.


From:Justin Wilson
Sent: Friday, April 07, 2017 4:06 PM
To:af@afmug.com
Subject: Re: [AFMUG] Cable documentation

The line guys would do the following at the local phone company I 
worked out many many years ago.  I am sure there are lots of better 
ways to do it with modern processes.


The cared about a few things.  Where can I find the splice points? 
Where can I find vaults? Where are my slack points on the path and how 
much is left or do I have? How do I do all this in the middle of the 
night during the rain? During install it was specified where the slack 
loops happen.  They would care about the overall material used when 
running cable.  If they ran down a road to a vault all they cared 
about was how much length off the spool was used. This was documented.


Once everything was installed the certification notes were included in 
the construction closeout drawings and put in an appendix at the back 
of the book.  The linemen did not care about such things.


I typical do not see fiber being in a twisted pair type of 
configuration.  Not sure what everyone else uses, but all the ones I 
pull apart are side by side.  I think there is even a “how it’s made” 
on fiber optic cable and it has a machine that makes sure they do not 
get twisted.


Just my .02.


Justin Wilson
j...@mtin.net

---
http://www.mtin.net Owner/CEO
xISP Solutions- Consulting – Data Centers - Bandwidth

http://www.midwest-ix.com  COO/Chairman
Internet Exchange - Peering - Distributed Fabric


On Apr 7, 2017, at 4:23 PM, Adam Moffett <dmmoff...@gmail.com> wrote:

I started a spreadsheet to document a fiber line.  I figure I'll make 
a new file for each cable, a worksheet for notes on the cable as a 
whole, a worksheet for each buffer tube, and a color coded column for 
each fiber.  Each row will be 100'.  My thought was, if I have a 
splice enclosure 4200' down the line, I'll go down to row 42 and 
enter "Splice enclosure on pole 305".  Then I can note on each fiber 
whether it passes through the enclosure, or note what it splices to, 
including a reference to another file if necessary.


I understand they used to do something similar with 3-ring binders 
for mapping the pairs on phone lines.


The first question I ran into was which distance do I go by:
The actual distance the line has traveled
The cable length, which will be ~15-20% longer due to slack loops
The fiber length, which will be longer still due to the built in 
twist.but is easily measurable with an OTDR.

All three somehow?

Is this even a smart method?  Plan B is to use GIS.  I can add every 
pole, cable, and enclosure as objects in their actual location with 
properties describing the actual distance, cable length, fiber length 
and anything else I want.


That would be technically better, but I'm the only one here who can 
use the GIS software whereas any boob can type into a spreadsheet.  
If I use a Google sheet then multiple people can use the same sheets 
and fill them in from their phone.


I'm sure these problems have been solved before, so what do you all 
do?


Re: [AFMUG] Cable documentation

2017-04-07 Thread dmmoffett
They twist the buffer tubes around each other in a loose tube cable.  It's so 
when you make a coil you're not putting all the stress on the fibers on the 
outside of the coil, but rather it's spread evenly.


Sent from my iPhone

> On Apr 7, 2017, at 6:06 PM, Justin Wilson  wrote:
> 
> The line guys would do the following at the local phone company I worked out 
> many many years ago.  I am sure there are lots of better ways to do it with 
> modern processes.
> 
> The cared about a few things.  Where can I find the splice points? Where can 
> I find vaults? Where are my slack points on the path and how much is left or 
> do I have? How do I do all this in the middle of the night during the rain? 
> During install it was specified where the slack loops happen.  They would 
> care about the overall material used when running cable.  If they ran down a 
> road to a vault all they cared about was how much length off the spool was 
> used. This was documented.  
> 
> Once everything was installed the certification notes were included in the 
> construction closeout drawings and put in an appendix at the back of the 
> book.  The linemen did not care about such things. 
> 
> I typical do not see fiber being in a twisted pair type of configuration.  
> Not sure what everyone else uses, but all the ones I pull apart are side by 
> side.  I think there is even a “how it’s made” on fiber optic cable and it 
> has a machine that makes sure they do not get twisted.
> 
> Just my .02.
> 
> 
> Justin Wilson
> j...@mtin.net
> 
> ---
> http://www.mtin.net Owner/CEO
> xISP Solutions- Consulting – Data Centers - Bandwidth
> 
> http://www.midwest-ix.com  COO/Chairman
> Internet Exchange - Peering - Distributed Fabric
> 
>> On Apr 7, 2017, at 4:23 PM, Adam Moffett  wrote:
>> 
>> I started a spreadsheet to document a fiber line.  I figure I'll make a new 
>> file for each cable, a worksheet for notes on the cable as a whole, a 
>> worksheet for each buffer tube, and a color coded column for each fiber.  
>> Each row will be 100'.  My thought was, if I have a splice enclosure 4200' 
>> down the line, I'll go down to row 42 and enter "Splice enclosure on pole 
>> 305".  Then I can note on each fiber whether it passes through the 
>> enclosure, or note what it splices to, including a reference to another file 
>> if necessary. 
>> 
>> I understand they used to do something similar with 3-ring binders for 
>> mapping the pairs on phone lines.
>> 
>> The first question I ran into was which distance do I go by:
>> The actual distance the line has traveled
>> The cable length, which will be ~15-20% longer due to slack loops
>> The fiber length, which will be longer still due to the built in 
>> twist.but is easily measurable with an OTDR.
>> All three somehow?
>> 
>> Is this even a smart method?  Plan B is to use GIS.  I can add every pole, 
>> cable, and enclosure as objects in their actual location with properties 
>> describing the actual distance, cable length, fiber length and anything else 
>> I want.
>> 
>> That would be technically better, but I'm the only one here who can use the 
>> GIS software whereas any boob can type into a spreadsheet.  If I use a 
>> Google sheet then multiple people can use the same sheets and fill them in 
>> from their phone. 
>> 
>> I'm sure these problems have been solved before, so what do you all do?
> 


Re: [AFMUG] Cable documentation

2017-04-07 Thread Justin Wilson
The line guys would do the following at the local phone company I worked out 
many many years ago.  I am sure there are lots of better ways to do it with 
modern processes.

The cared about a few things.  Where can I find the splice points? Where can I 
find vaults? Where are my slack points on the path and how much is left or do I 
have? How do I do all this in the middle of the night during the rain? During 
install it was specified where the slack loops happen.  They would care about 
the overall material used when running cable.  If they ran down a road to a 
vault all they cared about was how much length off the spool was used. This was 
documented.  

Once everything was installed the certification notes were included in the 
construction closeout drawings and put in an appendix at the back of the book.  
The linemen did not care about such things. 

I typical do not see fiber being in a twisted pair type of configuration.  Not 
sure what everyone else uses, but all the ones I pull apart are side by side.  
I think there is even a “how it’s made” on fiber optic cable and it has a 
machine that makes sure they do not get twisted.

Just my .02.


Justin Wilson
j...@mtin.net

---
http://www.mtin.net Owner/CEO
xISP Solutions- Consulting – Data Centers - Bandwidth

http://www.midwest-ix.com  COO/Chairman
Internet Exchange - Peering - Distributed Fabric

> On Apr 7, 2017, at 4:23 PM, Adam Moffett  wrote:
> 
> I started a spreadsheet to document a fiber line.  I figure I'll make a new 
> file for each cable, a worksheet for notes on the cable as a whole, a 
> worksheet for each buffer tube, and a color coded column for each fiber.  
> Each row will be 100'.  My thought was, if I have a splice enclosure 4200' 
> down the line, I'll go down to row 42 and enter "Splice enclosure on pole 
> 305".  Then I can note on each fiber whether it passes through the enclosure, 
> or note what it splices to, including a reference to another file if 
> necessary. 
> 
> I understand they used to do something similar with 3-ring binders for 
> mapping the pairs on phone lines.
> 
> The first question I ran into was which distance do I go by:
> The actual distance the line has traveled
> The cable length, which will be ~15-20% longer due to slack loops
> The fiber length, which will be longer still due to the built in 
> twist.but is easily measurable with an OTDR.
> All three somehow?
> 
> Is this even a smart method?  Plan B is to use GIS.  I can add every pole, 
> cable, and enclosure as objects in their actual location with properties 
> describing the actual distance, cable length, fiber length and anything else 
> I want.
> 
> That would be technically better, but I'm the only one here who can use the 
> GIS software whereas any boob can type into a spreadsheet.  If I use a Google 
> sheet then multiple people can use the same sheets and fill them in from 
> their phone. 
> 
> I'm sure these problems have been solved before, so what do you all do?



[AFMUG] Cable documentation

2017-04-07 Thread Adam Moffett
I started a spreadsheet to document a fiber line.  I figure I'll make a 
new file for each cable, a worksheet for notes on the cable as a whole, 
a worksheet for each buffer tube, and a color coded column for each 
fiber.  Each row will be 100'.  My thought was, if I have a splice 
enclosure 4200' down the line, I'll go down to row 42 and enter "Splice 
enclosure on pole 305".  Then I can note on each fiber whether it passes 
through the enclosure, or note what it splices to, including a reference 
to another file if necessary.


I understand they used to do something similar with 3-ring binders for 
mapping the pairs on phone lines.


The first question I ran into was which distance do I go by:
The actual distance the line has traveled
The cable length, which will be ~15-20% longer due to slack loops
The fiber length, which will be longer still due to the built in 
twist.but is easily measurable with an OTDR.

All three somehow?

Is this even a smart method?  Plan B is to use GIS.  I can add every 
pole, cable, and enclosure as objects in their actual location with 
properties describing the actual distance, cable length, fiber length 
and anything else I want.


That would be technically better, but I'm the only one here who can use 
the GIS software whereas any boob can type into a spreadsheet.  If I use 
a Google sheet then multiple people can use the same sheets and fill 
them in from their phone.


I'm sure these problems have been solved before, so what do you all do?