Re: TDP for Exchange Schedule reports failure

2003-10-17 Thread Chris Warren
/event. Bill Boyer DSS, Inc. -Original Message- From: ADSM: Dist Stor Manager [mailto:[EMAIL PROTECTED] Behalf Of Chris Warren Sent: Thursday, October 16, 2003 5:40 PM To: [EMAIL PROTECTED] Subject: TDP for Exchange Schedule reports failure We have an Exchange 2000 server with TDP

TDP for Exchange Schedule reports failure

2003-10-16 Thread Chris Warren
We have an Exchange 2000 server with TDP for Exchange 5.1.5. Currently, it is scheduled to run a full backup every night. The job reports that it failed, but if I look at the activity log I see that the job actually completed successfully. Has anyone else seen this? Chris