I need some help here. I am setting up a homelab with a 2501 and a 2502. I
have 2 CSU/DSUs also. I think I have an error in the wiring. The 2 csu's use
pin 1and 2 for transmit and 7 and 8 for receive. What I have done is crossed
thes pins 1 to 8 and 2 to 7 I've also tried 1 to 7 and 2 to 8 but
but I kindof wanted to do it with the CSU/DSUs. It should work this way
shouldn't it?
>>>Brian
>From: "Dale Holmes" <[EMAIL PROTECTED]>
>To: [EMAIL PROTECTED]
>Subject: Re: Wiring trouble?
>Date: Fri, 19 May 2000 13:02:18 EDT
>
>Remove the CSU
as to the wiring, your txmit pins should be identified as TX+ and TX-, rxmit
should be RX+ and RX- the wiring should be
TX+ to RX+
TX- to RX-
The clocking should be set as follows:
on one csu - internal or master
on the other - slave or network (terminology depends on vendor)
I would also tr
3 matches
Mail list logo