_
From: Mark Frye [mailto:ma...@berkeleysolar.com]
Sent: Sunday, August 22, 2010 6:58 AM
To: 'RE-wrenches'
Subject: RE: [RE-wrenches] useful info on wire color coding
Too lazy to look myself, but maybe one of you guys with an electronic
version of the Code can search
Steve,
Just to make sure I am not missing something, there is no way to directly
set Outback equipment for a particular return amp rate. Rather one must
observe the charge cycle and set the absorption timer accordingly.
Do have that right?
Thanks,
Mark Frye
Berkeley Solar Electric Systems
? Or is there a single bad
cell with high impedance in this string? Both, neither, something else, or
can't know without further information?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
OK,
So no takers for the low current string being in a healthier, higher state
of charge!
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
foothills location.
What exactly do you mean by harsh environment?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-Original Message-
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re
the batteries up
through the absorption phase, once the gen is shut off.
I would be interest to learn more about your approach to this.
Thanks,
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
Jay,
I took your advice on removing the foam and vents and it did make a
significant difference in the available charging power.
Thanks for the tip.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com
Is anyone using the Pentametric to provide SOC gen control in lieu of the
Outback AGS (w/o FlexNet DC)?
If so, how is it working? Any success/disaster stories?
Thanks,
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
of
three strings, and the output to the off-line sting, and let the MX keep the
off-line string in float?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
___
List sponsored by Home Power
What is the best way to measure cell temp in the situation you describe?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
In this case the 4 individual banks are connected to a common buss. All
four buss-to-bank cable sets are of identical lenght.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
sometime.
When a major capital component needs to be replaced they can make the best
choice at that time.
I like a lot of the other ideas that have come up such as more ventilation,
both of the room and the inverters.
Please any more thoughts you may have.
Mark Frye
Berkeley Solar Electric
current a constant maximum all the way up to the
absorption set point. So if I don't see this, I am looking for a problem
somewhere. Not so according to technical support.
Any thoughts?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
levels so I suppose it is
possible that entire chargers are being dropped, but I thought that was only
for managing the on/search mode on larger stacks.
I am guessing that this is more a matter of reporting errors in the mate.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City
The inverters are mounted in a vertical orientation.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun
parameters to match the seasonal condition including tacking on as much
absorption time as feasible.
So what to do with all those extra batteries? Can I cut them all out into
the individual cells, drain the acid and keep them in storage, available to
replace bad cells in the future?
Any advice?
Mark
. And at the
time that I complete this bulk charge, the battery bank will be restored
to 1320/1690 = 78% of its starting capacity.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
in whiskey or cigars. Still I like to think that the most
important thing is to do good clean work and you'll have not problems with
the inspectors. Getting past the permit counter is another matter.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401
requirements for
the sack of a few hundred bucks peals off the vanier of emerging maturity
and reveals the underlying backwards-ness inherent in the PV industry...
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com
I guess it would be both.
The slaves sees 208V line-line not 240V, and the phase angle is 120 deg not
180 deg.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re
controller to get to a PV based system
with gen support
2 - Get a 3K to 5K propane gen and and run as a gen based system with PV
support
3 -?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
Does anyone know about what it will cost me to have an out of warranty U
series inverter refurbished? By whom?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re
Try 250.32. In this case, you consider that the panels at the home are not
actually new service enterance equipment. The service is up at the shed
and the home is part of two or more buildings supplied from a common
service.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada
William,
What do you think about the reliability of the Tyco AC connectors used in
the Enphase system?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches-boun
the life cycle testing of the
inverter, but in this case it all comes back to a connector to connector
connection.
So a real question becomes, how will the Tyco connectors hold up over time
in real world applications.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
I have had 40 enphase 190s on a roof with sweeping shade for 4 months now. I
had no DOA units and no unit failures to date. They are part of a standard
Pro Solar rack.
That is about all I can say.
The customer is very happy.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada
Take it somewhere else.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org
, I don't nessecarily need to bond the EMT as if it were part of a
service.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
we have to split the AC output into two separate services.
How can this be done with a single inverter?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches
See Article 220 for load calculation and resulting breaker sizing
requirments.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
Jeff,
Here is what they submitted to the California Energy Commision:
http://www.gosolarcalifornia.ca.gov/equipment/inverter_tests/summaries/Froni
us%20IG%204000.pdf
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http
per pole or 11.5A Isc per pole.
Depending on the modules used, this may or may not preclude doubling up
strings on individual poles.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
http://millersolar.com/resources/SQDHU361Bulletin.pdf
Greg,
You can get it from William Miller's site.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-Original Message-
From: re-wrenches-boun...@lists.re
My guess:
Each unit is a DC to DC converter with a controllable 1:10 boost to the
output side; module side has a MPP tracker; inverter side outputs are
parralleled and adjust to a single common voltage. The string inverter sees
a constant DC voltage of 200-300 depending on the module Vmp.
Mark
, going from 2 weeks to 12 weeks leadtime in 2 weeks is no way to
manage customer expectation.
In my mind it's a black eye for Enphase. I am hoping that they will win a
feather back into their cap with an on time delivery of a stellar product.
Mark Frye
Berkeley Solar Electric Systems
303
/DC systems to the DC GEC and that this wire need only be
sized to the inverter PV AC backfeed breaker. This same conductor also
serves at the EGC for everything on up to the array.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
Rick,
I don't see that applying to Kelly's question.
He said that the AHJ is not requiring the separate array grounding in his
case. The discussion has to do with the number and sizing of conductors run
in various parts of the system in order to accomplish various grounding
requirements.
Mark
6 ft) to the practiable location, then the ne DC
array GEC must still be run directly to exist GE system which is now the
AC/DC GE system.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-Original Message-
From: re
the grounding
electrode system.
MPF
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-Original Message-
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of Kelly
to
respond with increasingly creative nterpretations.
I am in California which is inspecting to CEC 2007 referring to NEC 2005.
The next adoption cycle is 2010, so it will be a year before the California
AJH's have NEC 2008 officially on their desks.
Mark Frye
Berkeley Solar Electric Systems
303
sell them to the AJH, if
any.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-Original Message-
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of Richard L
He may have been refering to the California Electric Code.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches
?
Thanks,
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
___
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenches.org
Options settings:
http://lists.re
any of this matter?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf
inverters. No experience needed.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-Original Message-
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of Max
Bob-O,
It ain't that public, as in general public as in everybody here knows there
are 15-20% markups to list.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-Original Message-
From: re-wrenches-boun...@lists.re
estimated at the time of sales.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-Original Message-
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of Jason
much time it can save when it works.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re
with the Fronius White paper: one inverter, multiple strings, all modules
in any given string with the same orientation. If you must, throw a number
at the orientation loss, but how meaningful will it be in the overall
picture?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City
. Their data shows 12-15 year life expectancy. Most of these ties are
actually protected from direct sunlight and weather, so I think they have a
fighting chance in most environments.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
120% allowance is only ..For a dwelling unit.
Clearly this is a load side Point of Connection. If it is a dwelling unit
then the 120% allowance is applicable. If it is not a dwelling unit, then
there is no room to connect under NEC 2008.
Mark Frye
Berkeley Solar Electric Systems
303
to the decretion of the AHJ.
Still, if Jerry is going to rely on NEC 2008 to get the 120% for commercial,
it still doesn't sound like he can meet it since I assume that the bolts he
wants to use are not located on the opposite end of the buss from the main
breaker.
Mark Frye
Berkeley Solar Electric Systems
? If so,
by what authority?
If a solar heated storage tank (drain back) is installed ahead of the main
storage tank, does that change the requirements?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
Mike,
The RHH/RHW-2 do not cross to USE-2 because they do not have any rating for
UV exposure.
If these conductors are run outside of conduit on the array, you need USE-2
or PV conductor.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http
Mike,
If they are not in conduit (a raceway), then they are exposed. They may not
be and must not be subject to physical damage (protected by the modules,
etc.), but that does not mean they are not exposed and must have the USE-2 /
PV rating.
Mark Frye
Berkeley Solar Electric Systems
303
the CSI program.
So what are the real legal obligations (if enforced) that apply to what?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: [EMAIL PROTECTED]
[mailto
in operation?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
http://www.berkeleysolar.com/ www.berkeleysolar.com
_
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Chris
Anderson
Sent: Monday, November 10, 2008 1:17 PM
.
The question arises, what model for real maintenance costs over a 25 year
term should be included in estimates for an Enphase system.
Our industry is mature enough that we should expect this kind of information
from all providers, old and new.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way