Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-10-16 Thread Dave Angelini Offgrid Solar
..@sti.net; 'RE-wrenches' SUBJECT: Re: [RE-wrenches] Module-Level Shutdown for off grid systems [External email: Use caution with links and attachments] - Well, they have announced a new piece of equipment... At the moment it looks more like a dream than rea

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-10-16 Thread Sandra Herrera
have them… -Glenn From: RE-wrenches mailto:re-wrenches-boun...@lists.re-wrenches.org>> On Behalf Of Dave Angelini Offgrid Solar Sent: Wednesday, October 02, 2019 5:30 PM To: RE-wrenches mailto:re-wrenches@lists.re-wrenches.org>> Subject: Re: [RE-wrenches] Module-Level Shutdow

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-10-14 Thread Dave Angelini Offgrid Solar
stallation or use manuals available, no dealers I know have them... -Glenn FROM: RE-wrenches ON BEHALF OF Dave Angelini Offgrid Solar SENT: Wednesday, October 02, 2019 5:30 PM TO: RE-wrenches SUBJECT: Re: [RE-wrenches] Module-Level Shutdown for off grid systems Schneider now has a rapid shutdown

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-10-14 Thread Glenn Burt
To: RE-wrenches Subject: Re: [RE-wrenches] Module-Level Shutdown for off grid systems Schneider now has a rapid shutdown solution fro their Mppt's. Will be testing this here soon. https://solar.schneider-electric.com/product/mppt-disconnect-rs-for-nec-2017-compliance/ Dave Angelini Of

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-10-02 Thread Dave Angelini Offgrid Solar
Schneider now has a rapid shutdown solution fro their Mppt's. Will be testing this here soon. https://solar.schneider-electric.com/product/mppt-disconnect-rs-for-nec-2017-compliance/ [1] Dave Angelini Offgrid Solar "we go where powerlines don't" http://members.sti.net/offgridsolar/ [2] e-mail

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-30 Thread Jason Fisher (STC)
that position. I’d bring that up in a constructive discussion though. Jason From: RE-wrenches on behalf of Dave Angelini Offgrid Solar Sent: Monday, September 30, 2019 6:49 PM To: RE-wrenches Subject: Re: [RE-wrenches] Module-Level Shutdown for off grid systems

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-30 Thread Dave Angelini Offgrid Solar
E-wrenches on behalf of Ray SENT: Monday, September 30, 2019 1:40 PM TO: re-wrenches@lists.re-wrenches.org SUBJECT: Re: [RE-wrenches] Module-Level Shutdown for off grid systems The PV system (and 690.12) stop at the PV Disconnect. (see figure 690.1(b), Note (2)). Charge Controllers are part o

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-30 Thread Dave Angelini Offgrid Solar
ting in 2014 and continuing to 2020. If anyone has specific ideas for 2023 improvements please let me know.Hope some of that helps you all.Jason Fisher stc.ja...@gmail.com - FROM: RE-wrenches on behalf of Ray SENT: Monday, September 30, 2019 1:40 PM TO: r

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-30 Thread Jason Fisher (STC)
[RE-wrenches] Module-Level Shutdown for off grid systems The PV system (and 690.12) stop at the PV Disconnect. (see figure 690.1(b), Note (2)). Charge Controllers are part of the Energy Storage system (706) now. We presented this in our plan sets, and we drew clear lines on the wiring dia

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-30 Thread Ray
The PV system (and 690.12) stop at the PV Disconnect. (see figure 690.1(b), Note (2)).  Charge Controllers are part of the Energy Storage system (706) now.  We presented this in our plan sets, and we drew clear lines on the wiring diagram showing which articles applied to which parts of the sys

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-28 Thread jay
HI Jason Does that mean that 690.12 B 1 would apply with the following. A ground mounted or external array to a living structure and if the CC was less than 1 meter from entry into the building You wouldn’t need rapid shut down? jay peltz power > On Sep 27, 2019, at 6:56 PM, Jason Fisher (ST

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-28 Thread Darryl Thayer
Fire raptor will provide rapid shutdown at module level. Midnight also has the SOB. FireRaptor requires a control cable two wire, which can be powered by a 24 volt AC or a DC source. The Midnight SOB uses PLC from an AC or DC source. Outback uses the FireRaptor the two wire cable daisy chains

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-28 Thread Dave Angelini Offgrid Solar
not require any shutdown, just sensible disconnection requirements.Jason Fisher - FROM: RE-wrenches on behalf of Chris Sparadeo SENT: Friday, September 27, 2019 5:00 PM TO: RE-wrenches SUBJECT: Re: [RE-wrenches] Module-Level Shutdown for off grid systems For AC

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-27 Thread Jason Fisher (STC)
--- From: Jerry Shafer Date: Fri, Sep 27, 2019 1:40 PM To: RE-wrenches; Cc: Subject:Re: [RE-wrenches] Module-Level Shutdown for off grid systems Wrenches Yes l am looking at the Tigo, they work with SMA and outback, Jerry On Fri, Sep 27, 2019, 10:24 AM Lorenzo Ortiz mailto:lore...@cal-solar.com&g

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-27 Thread Chris Sparadeo
;smart'phone, so please excuse typos and spelling errors. >> >> ------ Original message------ >> *From: *Jerry Shafer >> *Date: *Fri, Sep 27, 2019 1:40 PM >> *To: *RE-wrenches; >> *Cc: * >> *Subject:*Re: [RE-wrenches] Module-Level Shutdown for off grid

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-27 Thread Glenn Burt
The difference in topologies is that when the Tigo devices are used with an inverter driving the control is that it is relying on the Sunspec Alliance standard to be implemented correctly between the inverter manufacturer and Tigo.When using the Tigo devices at the modules and the Togo RSS box f

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-27 Thread Lones Tuss
ile Communication Alarm Signalling * Compliant with NEC 2014 & NEC 2017 * Suitable for New Installations or Retro-Fit From: RE-wrenches On Behalf Of Lorenzo Ortiz Sent: Friday, September 27, 2019 10:23 AM To: RE-wrenches Subject: [RE-wrenches] Module-Level Shutdown for off grid

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-27 Thread Lorenzo Ortiz
Thanks Mac. Yeah, Tigo was my first choice but then a search turned up this product, the FireRaptor . Funny name and something I haven't heard a lot a

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-27 Thread Ray
Midnite Solar has their SOB system that attaches inline with the modules. It can do both String level and module level shutdown. We've used it off grid with success.  The biggest issue is it is not compatible with most charge controllers, except Magnum's PT 100 for some reason.  We used the PT

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-27 Thread Jerry Shafer
Wrenches Yes l am looking at the Tigo, they work with SMA and outback, Jerry On Fri, Sep 27, 2019, 10:24 AM Lorenzo Ortiz wrote: > Wrenches, > > Are any of you looking ahead at solutions for module level rapid shutdown > for off grid? Here in CA it's being implemented next year (at least in my >

Re: [RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-27 Thread Mac Lewis
Hi Loren, We try to stay off the roof for off-grid in Colorado but I'm about to do an 8 panel, 2 string system because of a building code where this cabin is located. I talked with Tigo about it and the parts list is: 8 x's Tigo TS4-A-F for each module 1 x's Tigo RSS The RSS will signal the TS4s

[RE-wrenches] Module-Level Shutdown for off grid systems

2019-09-27 Thread Lorenzo Ortiz
Wrenches, Are any of you looking ahead at solutions for module level rapid shutdown for off grid? Here in CA it's being implemented next year (at least in my area) and I haven't found any reliable, proven, *cost-effective* products yet. I know Tigo has some sort of inline component but haven't hea