Jason Cunningham wrote:
(just noticed my work on the South Devon Link Road and surrounding area has been
deleted, then the same info re-added by someone else! I've been cleansed from
the history.)
This is the more 'irritating' bit here. People spending a substantial amount of
time doing work
Just spotted all the activity on this thread which is great to see.
Personally I am reasonably neutral on what policy emerges from this
conversation.
I do agree that few schemes are really really certain until the diggers
arrive. By way of example, I personally removed the Longdendale bypass (
On Mon, Dec 10, 2012 at 7:56 PM, Dave F. dave...@madasafish.com wrote:
On 10/12/2012 08:18, Kevin Peat wrote:
On Dec 10, 2012 1:25 AM, Dave F. dave...@madasafish.com wrote
No. We should be mapping physical objects...
There are plenty of non-physical objects mapped in OSM
As primary
On 11/12/2012 11:18, John Sturdy wrote:
Yes --- administrative boundaries, for example.
__John
Fine, but that's kind of missing the point. That boundary is physical in
that it does actually exist in statute books maps. The proposed autumn
statement developments aren't (and probably won't
From: Dave F. [mailto:dave...@madasafish.com] wrote:
Sent: 11 December 2012 12:16
Cc: talk-gb@openstreetmap.org
Subject: Re: [Talk-GB] Added road schemes announced in the Autumn
Statement in OSM
On 11/12/2012 11:18, John Sturdy wrote:
Yes --- administrative boundaries, for example
On 11/12/2012 12:29, Andy Robinson wrote:
http://www.highways.gov.uk/roads/road-projects/a11-fiveways-to-thetford-impr
ovement/
Great. Then tag the fencing, access tracks construction site. They're
physical.
___
Talk-GB mailing list
David Earl wrote:
http://www.highways.gov.uk/roads/road-projects/a11-fiveways-to-thetford-improvement/
Yes indeed, it's true, they have been clearing the trees through the forest
alongside the existing road and levelling the ground. It's been closed overnight
in sections to do this so I had to
This subject kind of came up when the HS2 route was announced and made
available as open data. I didn't agree with that proposed route being added
to Openstreetmap, because I didn't feel the likelihood of it happening was
high enough.
Below is my, slightly amended, views on 'proposed' routes
On Dec 10, 2012 1:25 AM, Dave F. dave...@madasafish.com wrote
No. We should be mapping physical objects...
There are plenty of non-physical objects mapped in OSM but I don't see the
point of adding road schemes to the db before contracts are awarded. The
South Devon Link Road near me was in
Kevin Peat wrote:
No. We should be mapping physical objects...
There are plenty of non-physical objects mapped in OSM but I don't see the point
of adding road schemes to the db before contracts are awarded. The South Devon
Link Road near me was in the planning stage for more than 25 years
On 10/12/2012 08:18, Kevin Peat wrote:
On Dec 10, 2012 1:25 AM, Dave F. dave...@madasafish.com
mailto:dave...@madasafish.com wrote
No. We should be mapping physical objects...
There are plenty of non-physical objects mapped in OSM
As primary tags?
Dave F.
On 07/12/2012 14:10, SomeoneElse wrote:
Peter Miller wrote:
Just to say that I have added tagging and a relations for both of the
main road schemes mentioned specifically in the Autumn Statement.
Is there any actual benefit to doing this before construction actually
starts?
No. We should
On 7 December 2012 14:10, SomeoneElse li...@mail.atownsend.org.uk wrote:
Peter Miller wrote:
Just to say that I have added tagging and a relations for both of the
main road schemes mentioned specifically in the Autumn Statement.
Is there any actual benefit to doing this before construction
Just to say that I have added tagging and a relations for both of the main
road schemes mentioned specifically in the Autumn Statement. I have also
updated a couple of other schemes to use the same tagging as outlined in
prefix (status:key = value) method of tagging life-cycle details as
outlined
Peter Miller wrote:
Just to say that I have added tagging and a relations for both of the
main road schemes mentioned specifically in the Autumn Statement.
Is there any actual benefit to doing this before construction actually
starts? Until that point nothing on the ground has changed -
On 7 December 2012 14:10, SomeoneElse li...@mail.atownsend.org.uk wrote:
Peter Miller wrote:
Just to say that I have added tagging and a relations for both of the
main road schemes mentioned specifically in the Autumn Statement.
Is there any actual benefit to doing this before construction