Umm . . . they spelled calibration wrong. It is unprofessional.
Lugano Thermal Verification - Caibration
, Feb 3, 2015 2:55 pm
Subject: Re: [Vo]:MFMP testing schedule
There was a voltage multiplier set in the setup of the PCE that has been
corrected. In-line measurements are being used to verify the setup of the PCE.
I don't think they should be using the SCR controller - I would rather they
use
There was a voltage multiplier set in the setup of the PCE that has been
corrected. In-line measurements are being used to verify the setup of the
PCE. I don't think they should be using the SCR controller - I would
rather they use the variac. The load should be pretty much flat-on
resistive
, 2015 2:55 pm
Subject: Re: [Vo]:MFMP testing schedule
There was a voltage multiplier set in the setup of the PCE that has been
corrected. In-line measurements are being used to verify the setup of the
PCE. I don't think they should be using the SCR controller - I would
rather they use
The guys performing the test are being tricked by the phase shift between the
current and the supply voltage. A triac controller will cause that to happen.
Can someone contact them directly and let them know that this may be the
hangup. It is painful to watch them chasing this problem.
I
They should celebrate their spell checker.
On Tue, Feb 3, 2015 at 5:29 PM, Jed Rothwell jedrothw...@gmail.com wrote:
Umm . . . they spelled calibration wrong. It is unprofessional.
Lugano Thermal Verification - Caibration
it is of little
value.
Dave
-Original Message-
From: Bob Higgins rj.bob.higg...@gmail.com
To: vortex-l vortex-l@eskimo.com
Sent: Tue, Feb 3, 2015 3:06 pm
Subject: Re: [Vo]:MFMP testing schedule
The PCE830 will take this into account for all of the harmonics automatically
once
If only it could be that simple ... the wire resistance is changing as a
function of temperature. For the Kanthal A1 wire, it is not changing too
much though. But it is still a good and easy sanity check measurement.
Bob
On Tue, Feb 3, 2015 at 1:16 PM, David Roberson dlrober...@aol.com wrote:
Good point Bob. I always like to have sanity checks to back up main, important
measurements.
Dave
-Original Message-
From: Bob Higgins rj.bob.higg...@gmail.com
To: vortex-l vortex-l@eskimo.com
Sent: Tue, Feb 3, 2015 4:09 pm
Subject: Re: [Vo]:MFMP testing schedule
If only
9 matches
Mail list logo