An existing AFFF foam system, supplied by sea water, needs the pumps
replaced.  The pipe supplying the pumps, and from the pumps to the deluge
valves, in diameters from 8" to 4", totals less than 200' in length.

 

Our client is looking to us for guidance on what kind of pipe should be used
to replace the old pipe.  The old pipe is black steel.  How do you determine
the cost effectiveness of new steel pipe vs. ductile cement lined vs.
galvanized vs. stainless steel?  How do you estimate life of pipe?  From
your experience, what other concerns should be considered for this decision?

 

Thanks for the help.

 

Benjamin Schrader

Maine Fire Protection Systems

6 Dowd Rd

Bangor, ME 04401

phone (207) 942-8809

fax (207) 941-1910

email [EMAIL PROTECTED]

 

 

 

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to