Sorry for the late reply to Mark's comments, I've been travelling all day. I saw this and felt compelled to repeat my previous thoughts on this issue. Mark's comments bring me to a statement that I have made on here before, and I will likely again, the next time this comes up. You cannot just complain about this PE issue. Turn them in!! There is no other way. Their regulating Boards can do nothing without a complaint, and for that matter thay will NOT even know about it, unless WE speak up and do something about it. Yes, that's right, an engineer telling you to turn in a fellow engineer. I will not defend anyone that claims this or anything else as an area of expertise when they are not actually qualified. Turn them in! And don't get fed up if nothing happens right away. Their investigations may take a while. Again, rather than seeing all of these complaints about inept specifying engineers, let's all do something different now, or it will only get worse. Gather your facts, file the complaint, and turn them in. Jeff Hewitt, PE, SET, MSFPE (Professional Member) Corporate Engineer Bi-State Fire Protection Corporation St. Charles, MO 63301
Mark Sornsin <[EMAIL PROTECTED]> wrote: When I "look up" at work that is incorrect, I always wonder if there was an engineer of record involved on the project. Then I wonder how much money they were paid to be the "engineer of record." Then I wonder how much time they actually spent on their "performance spec" that included no performance criteria outside of references to code. Obviously, mine is a cynical perspective of my colleagues in the engineering world. I certainly understand the reality that there aren't enough skilled engineers to be involved on all sprinkler projects. To say the typical "performance spec" is criminal may be excessive (maybe they couldn't get enough fee to do the project justice...?) But I do know that all engineers who rely on their blanket statement about systems "meeting code" (but don't have the ability to verify compliance) to are teed-up nicely to lose the litigation battle should a fire ever occur. As Chris has reminded us, there seem to be an inordinate number of screwed up systems out there, so it's really a wonder why more engineers aren't brought to task through litigation. Sometime I wonder if it is because of the ironic fact that "everyone" knows the mechanical engineer is not the expert - it's the sprinkler contractor. So engineers are forgotten when problems arise...??? Don't mean to tangent into another PE-bashing thread, but it just peeves me that there are "professionals" getting paid for being lazy fools. Mark A. Sornsin, PE Fire Protection Engineer Ulteig Engineers, Inc. Fargo, ND 701.280.8591 [EMAIL PROTECTED] -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Chris Cahill Sent: Wednesday, April 02, 2008 12:29 PM To: [email protected] Subject: Do you look up? I imagine, like me, you all (ya'll for some of you) on the very rare occasions you are not working look around at sprinkler systems where you live, shop and play. It's a very rare occasion I don't see something that appears deficient. For example, in a grocery store the one head on the back side of the main is missing over HPS and a mess of piping creating a ceiling without heads under them, at a Home Depot 190 psi on the wet side of an auxiliary dry valve, or the local high school with sidewall heads about 15-20' down from the peak of the very large skylight. This is all in the last two days as an example but see similar all the time. The sad part is I'm not really trying. What if I had the plans and calcs, how much more would there be? Or really looked at the whole building instead of a casual look at where I happen to be? Or the scary part what if I actually considered the hazard vs. the design? I also realize two issues - most times what I see probably won't cause the system to fail in a fire IF that is the only thing wrong. There is a "probably" and an "if " in the last sentence which means there are cases that will fail, just not many IMHO. And second we make mistakes too. The heads at the peak - just because an AHJ didn't call it a deficiency doesn't mean it's OK. Certainly it is possible there is a documented and proactively approved alternate method out there on this but I strongly doubt it. Now I'm sure the missing head has a perfectly rational explanation of how it got like that. The W.O. is there and it must be plugged or the system is off. It's not a TI thing long after the original construction; this is a very new building. Can't rationalize how you get 190 psi by accident or approval. MN is more regulated than most (but not all) areas. Do you see this stuff too? What if anything can you really do about it? Chris Cahill, P.E. Fire Protection Engineer Sentry Fire Protection, Inc. 763-658-4483 763-658-4921 fax Email: [EMAIL PROTECTED] Mail: P.O. Box 69 Waverly, MN 55390 Location: 4439 Hwy 12 SW Waverly, MN 55390 _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)
