The building is a mix of wet and dry LH systems so in areas of dry, I can
not take the area reduction and flowing the minimum is definitely not a
problem..

On Tue, Sep 1, 2009 at 8:42 AM, George Church <[email protected]> wrote:

>
> Don't forget that if you're in LH, you need to consider if you'll end up
> flowing more heads with the EC requirement to flow a min of 5, vrs using
> room design or 900 SF (vrs 5 EC's at 400=2,000!).