The building is a mix of wet and dry LH systems so in areas of dry, I can not take the area reduction and flowing the minimum is definitely not a problem..
On Tue, Sep 1, 2009 at 8:42 AM, George Church <[email protected]> wrote: > > Don't forget that if you're in LH, you need to consider if you'll end up > flowing more heads with the EC requirement to flow a min of 5, vrs using > room design or 900 SF (vrs 5 EC's at 400=2,000!). _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)
