where does it say that for a pipe schedule system that there is a difference for dry pipe?

Roland

On Aug 11, 2010, at 9:33 AM, John O'Connor wrote:

And if the system is converted to dry can the existing pipe schedule afford the 30% area increase while flowing water thru two pieces of 1" at the end
of all lines.  I doubt it.
John O'Connor

-
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to