This is my first time posting here and I am hoping to get some guidance.
This project is based on NFPA 2007. 

 

I am currently designing a system to provide coverage to a local Propane
supplier. They have a remote covered filling station. There will be propane
pumps under the awning and there is a nearby tank. This is a first for me.
The Architect has provided a room for a dry pipe riser and they are under
the assumption that we should be able to provide dry pipe system and heads
for coverage. I am not so sure that is going to be the case. Has anybody
done something like this? 

 

Thank You ,

 

fsc small  S e a n  P e t e r s o n | senior designer

FACILITY SYSTEMS CONSULTANTS, LLC

713 South Central Street, Suite 101

Knoxville, Tennessee 37902

Ph: (865) 246-0164  

Fx: (865) 246-1084

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120113/0ca3848e/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 1031 bytes
Desc: not available
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120113/0ca3848e/attachment.jpg>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to