If you plan to use internally painted pipe on DOD projects you'd best look at their painting specs, first to see if they've added something for internal, and then at their sprinkler painting spec. I doubt you'd ever find pre-painted stuff. How a fab shop would this is speculative but they'd have to pig it witha swab I'd guess.
On Mon, Feb 4, 2013 at 5:47 AM, Justin Reid <[email protected]>wrote: > I was just going through NFPA 20 2010 edition and noticed Section > 4.13.1.2 talking about using galvanized steel pipe or steel pipe > painted on the inside for suction piping in corrosive water > conditions. > > Anybody have any experience with pipe painted on the inside? A couple > of internet searches later I have been unsuccessful in finding info > about internally painted sprinkler pipe. > > An updated UFC 3-600-01 was issued last week and galvanized piping is > no longer permitted on DOD projects. > > Justin Reid > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum > -- Ron Greenman Instructor Fire Protection Engineering Technology Bates Technical College 1101 So. Yakima Ave. Tacoma, WA 98405 [email protected] http://www.bates.ctc.edu/fireprotection/ 253.680.7346 253.576.9700 (cell) Member: ASEE, SFPE, ASCET, NFPA, AFSA, NFSA, AFAA, NIBS, WSAFM, WFC, WFSC They are happy men whose natures sort with their vocations. -Francis Bacon, essayist, philosopher, and statesman (1561-1626) -------------- next part -------------- An HTML attachment was scrubbed... URL: <http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20130204/0d64599f/attachment.html> _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum
