OK, working late and can't figure this on out conclusively....not diagrams
match this case.

If you use BB heads at the peak of an attic with AP sprinklers at the hip
on each end of the building and on elone at the eave along the entire
length of the building since the bldg is over 60'-0" wide.
Figure 22 identifies the Dry System with BB's and the AP's at the peak, but
doesn't show the eave AP's.
Figure 20-B-2 identifies the BB heads and AP heads at the eave, but doesn't
show the hip.

I assume you have to follow the guidelines of Figure 22 and calculate 1,950
sqft including the hip and eaves until I get the 1,950 sqft.....anybody
know?

Thanks,


-- 
Greg McGahan
Living Water Fire Protection, LLC <http://www.livingwaterfp.com>
1160 McKenzie Road
Cantonment, FL 32533
850-937-1850
fax 850-937-1852
-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20130320/33bb69fe/attachment.html>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to