If it's Walmart, they don't give out CAD files. Always have this as a CYA clause in your contract.
Todd G Williams, PE Fire Protection Design/Consulting Stonington, CT www.fpdc.com 860-535-2080 (ofc) > On Mar 3, 2014, at 2:21 PM, Brian Harris <[email protected]> wrote: > > Just taking a little poll: If after you've been awarded a job the GC will > not provide you with cadd backgrounds what would you do? In this particular > case we are working on a large grocery store with (2) adjacent shops, we have > offered to redraw the backgrounds for a reasonable fee and the guys thinks > we're nuts.... > > Brian Harris, CET > BVS Systems Inc. > Sprinkler Division > bvssystemsinc.com<http://bvssystemsinc.com/> > Phone: 704.896.9989 > Fax: 704.896.1935 > > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
