I have a 1,300SF tenant finish project in a building that is post tension
concrete. The tenant is dropping in a T-Bar grid ceiling throughout the
space.

 

I have the existing piping dropping new pendents to the ceiling and removing
the uprights. The AHJ has rejected the plans based on the removal of the
uprights citing 8.15.1.2.1 and 8.15.1.2.2 (NFPA 13:2013).

 

His contention is that a T-Bar ceiling is a fully accessible space, and
therefore requires sprinkler protection above. Anyone been hit with this
before? 

 

Marc Walter, SET

Sprinkler Design Services

780 6th Avenue

Seaside, OR  97138

(503) 956-4019

 