In our area some of the civil contractors use installers that do not have a plumbing TQ so are not allowed to install any piping inside a building and as such stop 3'-0" outside the building and the plumber or sprinkler contractor has to install the last 5'-0" of pipe and the riser. Always a pain as the general contractor needs the last piece installed so they can pour the floor or footings.
Thank you James Crawford Phaser Fire Protection Ltd. Phone 604-888-0318 Fax 604-888-4732 Cel 604-790-0938 Email [email protected] -----Original Message----- From: Sprinklerforum [mailto:[email protected]] On Behalf Of Todd Williams Sent: Tuesday, March 29, 2016 1:00 PM To: [email protected] Subject: UG 5 ft outside building Is there a rational explanation why the sprinkler contractor should bring in the last piece of underground from 5 ft outside the building? Todd G Williams, PE Fire Protection Design/Consulting Stonington, CT 860-535-2080 (ofc) 860-608-4559 (cell) Sent using CloudMagic [https://cloudmagic.com/k/d/mailapp?ct=ti&cv=6.0.64&pv=8.2] _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org