I am working on a project that the owner wants to install a wire mesh divider. The screen is made out of 0.188" dia. wire in a 2" square pattern. I'm saying heads are not required on both sides but I'm getting push back from the engineer reviewing the plans. What say ye?
Brian Harris, CET BVS Systems Inc. Design Manager bvssystemsinc.com<http://bvssystemsinc.com/> Phone: 704.896.9989 Fax: 704.896.1935
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
