We've had resent jobs where the GC has told us to remove the piping from the electrical room and just install a sidewall. We've been following NEC 110.26 (f) (2008).
Has there been a change to the electrical code / CBC requiring this? Jerry Van Kolken Millennium Fire Protection Corp. 2950 San Luis Rey Rd. Oceanside, CA 92058 (760) 722-2722 FX 722-2730
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
